Laserfiche WebLink
CC Regular Session <br />Meeting Date: <br />06/10/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 15. <br />Title: <br />Adopt Resolution #25-129 Approving Construction Contingency Expense No. 9 for Improvement Project #21-09, <br />Centralized Water Treatment Plant <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-129 approving Construction Contingency Expense No. 9 for <br />Improvement Project #21-09, Centralized Water Treatment Plant. <br />Background: <br />Construction costs for the Water Treatment Plant (WTP) include a construction contingency allowance of <br />$950,000 to pay for new items identified during construction that were not contemplated during the design <br />process, or for items that the owner, engineer, or contractor(s) propose to revise during construction. This <br />construction contingency allowance is equal to approximately 3-percent of the overall construction bid price. Any <br />unused allowance funds will be deducted from the final payment. <br />The attached letter from Resident Project Representative Ryan Hanson with Advanced Engineering and <br />Environmental Services, Inc. (AE2S), the City's contracted project engineer, identifies those items approved <br />under previous Construction Contingency Expense No.'s 1 through 8, as well as the seven (7) items proposed to <br />be adjusted during construction as part of Construction Contingency Expense No. 9. <br />No extension of time is being requested as part of Construction Contingency Expense No. 9. However, the <br />contractor may decide at a later date to request an extension of time for any of the Construction Contingency <br />Expenses. If a time extension request is made, it will be presented at a later date in the form of a formal Change <br />Order request. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />The modifications proposed with Construction Contingency Expense No. 9 will serve to reduce maintenance costs <br />and improve environmental and operating conditions within the WTP over the life of the plant. <br />Alternatives: <br />Motion to adopt Resolution #25-129 approving Construction Contingency Expense No. 9 for Improvement <br />Project #21-09, Centralized Water Treatment Plant. <br />Funding Source: <br />