Laserfiche WebLink
AGNEYCONSTRUCTION <br />IIII <br />COMMERCIAL Cr INDUSTRIAL CONTRACTORS <br />gder ow 1401 Park Road - Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />AE2S <br />Proposal <br />From <br />Noah Pundsack <br />Attention <br />Abby Bowman <br />Date <br />01/30/2025 <br />E-mail Phone <br />Abigail.Bowman@AE2S.com (763) 463-5036 <br />Magney Proposal No. 032 <br />Additional Dewatering For Watermain Installation <br />Urgent Please comment <br />Total pages, including cover: 2 <br />X❑ Please review <br />COMMENTS <br />For your information <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Abby, <br />Magney Construction, Inc. is seeking compensation for the additional labor, material, and equipment required <br />to install the watermain at a deeper elevation than shown on the drawings. The Additional dewatering was <br />required to install the watermain connecting into watermain entering the plant from under 143 rd. Ave. See <br />the costs associated with change summarized below. <br />Labor: <br />Equipment: <br />Equipment: Misc. Small Tools And Equipment (10% of Labor) <br />Subcontractor: Al Excavating Install, & Remove Dewatering equipment $ 10,200.00 <br />Subtotal $ 10,200.00 <br />General Contractor's Overhead $ 510.00 <br />Bond & Insurance premiums $ 160.65 <br />Lump Sum Total: <br />$ 10,870.65 <br />Additional Calendar Days Required for this Change <br />Including material lead time <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />Noah Pundsack <br />Project Engineer <br />Accepted By Date <br />Page 1 of 1 <br />