Laserfiche WebLink
AGNEYCONSTRUCTION <br />IIII <br />COMMERCIAL Cr INDUSTRIAL CONTRACTORS <br />gder ow 1401 Park Road - Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />AE2S <br />Proposal <br />From <br />Noah Pundsack <br />Attention <br />Abigail Bowman <br />Date <br />4/22/2025 <br />E-mail Phone <br />Abigail.Bowman@ae2s.com (763) 463-5036 <br />Magney Proposal # 039 <br />6" Rainwater Leader Route Modification <br />Urgent Please comment <br />Total pages, including cover: 2 <br />X❑ Please review <br />COMMENTS <br />For your information <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Abby, <br />Magney Construction, Inc. is seeking compensation for the additional labor, material, and equipment required <br />to complete the changes recommended by AE2S to reroute the 6" Rainwater leader South passing through <br />the hallway to avoid passing over the electrical room and panels. See the costs associated with change <br />summarized below. <br />Labor: $ <br />Material: $ <br />Equipment: $ <br />Subcontractor: Northern Plumbing Tech. (see attached) $ 3,225.00 <br />Subtotal $ 3,225.00 <br />General Contractor's Overhead $ 161.25 <br />Bond & Insurance premiums $ 50.79 <br />Lump Sum Total: <br />$ 3,437.04 <br />Additional Calendar Days Required for this Change <br />Including material lead time <br />0.0 <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br /><..." e`1/„J,r"/�P(v( <br />Noah Pundsack <br />Project Engineer <br />Accepted By Date <br />Page 1 of 1 <br />