Laserfiche WebLink
WATER FEATURE COSTS <br />N <br />i <br />O <br />a--. <br />V <br />CO <br />Cr- l <br />• <br />0 <br />0 <br />N <br />s <br />a) <br />> <br />-i <br />a) <br />fa <br />a <br />ca <br />a <br />co <br />a <br />E <br />ea <br />i <br />ea <br />N <br />N <br />O <br />4- , <br />co <br />a) <br />i <br />a) <br />r. <br />a-+ <br />O <br />N <br />a--. <br />N <br />0 <br />v <br />> Size of the Water Feature <br />> Equipment and Filtration System <br />E <br />O <br />0 <br />> 0 <br />O O <br />i <br />c >, <br />o U � <br />-0 <br />0) O <br />c (f) <br />E 06 <br />E <br />2 c <br />s <br />O <br />J <br />A A <br />> Construction Materials <br />> Amenities <br />> Bidding Climate & Number of Bidders <br />THE WATERFRONT / 12 / 14 / 2023 <br />