Laserfiche WebLink
#24-13 Fox Ridge Estates 1st and 2nd Additions Street Reconstruction <br />• Construction in progress ...nearing substantial completion <br />#24-14 Ramsey Gateway Mississippi River Outfall Removal <br />• Construction scheduled from 6/16 to 6/20 <br />#24-51 TH 47 Trail Gap Connection — 142nd Avenue to Xkimo Street <br />• Bolton & Menk prepared plans and specs for 10' trail construction <br />• Working with MnDOT to determine cost contributions and project schedule <br />#23-19 COR Infrastructure Improvements <br />• Construction complete <br />• Punch list items are being addressed <br />#23-20 COR Mass Grading <br />• Construction complete <br />• Waiting for seed to germinate before issuing final payment <br />#21-09 Centralized Water Treatment Plant <br />• Construction in progress <br />• City Council tour Summer 2025 <br />• Completion Fall/Winter 2025 <br />#20-11 Ramsey Gateway Highway 10 Improvements <br />• Sunfish Lake Blvd grade separations (RR and TH10) substantially complete <br />• Ramsey Blvd grade separations (RR and TH10) construction in progress <br />• Final completion anticipated June 2026 <br />• Project webpage https://www.anokacountymn.gov/3918/Hwy-lORamsey-Blvd-Interchange <br />City of Anoka Improvement Projects <br />Ferry Street (Trunk Highway 47) Grade Separation of BNSF Rail Crossing <br />• City -led project <br />• $45M in bonds authorized October 2020 <br />• 2028 construction anticipated <br />Highway 47 Corridor Improvements —Garfield St to Bunker Lk Blvd <br />• Combined with above City -led project <br />• 3-lane design <br />• Received regional solicitation funds for 2027 construction <br />• Permanent signal system at McKinley Street <br />• Construction proposed for 2027 - 2029 <br />Anoka County Improvement Projects <br />• No updates. <br />MnDOT Improvement Projects <br />Highway 10 Mill & Overlay and RCI Improvements <br />• Mill & Overlay US 10/169 pavement from approx. 1/2-mile west of Cleveland/Jarvis Avenue in Elk River to <br />1/2-mile west of Ramsey Boulevard in Ramsey, including Dayton Rest Area <br />• Construct Reduced Conflict Intersection (RCI) improvements for the intersections of Edison Street and <br />Jarvis Street in Elk River, and Alpine Drive and Beatty Drive in Ramsey <br />• Construct J-Turns <br />• Remove median crossings <br />• Extend pedestrian trail south of US 10/169 from 500-feet East of Adams Street to Edison Street <br />• Construct pedestrian refuge in median of US 10/169 at Jarvis Street <br />