My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/17/2025
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2025
>
Agenda - Public Works Committee - 06/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 2:39:39 PM
Creation date
6/12/2025 3:28:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/17/2025
Tags
OCRed
Description:
Used to identify documents that are OCRed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. 2. <br />Public Works Committee <br />Meeting Date: 06/17/2025 <br />Primary Strategic Plan Initiative: Improve the safety and mobility of transportation corridors. <br />Title: <br />Update on Minnesota Department of Transportation 2027 Highway 10 Mill and Overlay and Reduced Conflict <br />Intersection Improvements Project <br />Purpose/Background: <br />Staff was recently made aware of a proposed Minnesota Department of Transportation (MnDOT) 2027 Highway <br />10 Pavement Mill & Overlay and Reduced Conflict Intersection Improvements project. <br />MnDOT proposes to construct the following improvements along the Highway 10 corridor between the end of the <br />Ramsey Gateway Highway 10 Improvements project and Edison Street. <br />• Mill and overlay bituminous pavement on Highway 10 generally between the West end of the Ramsey <br />Gateway Highway 10 Improvements project and Edison Street. <br />• Construct Reduced Conflict Intersection (RCI) improvements including: <br />• Construct WB to EB J-Tum approximately 500-feet West of Jarvis Street (Elk River) <br />• Construct EB to WB J-Tum approximately 500-feet East of Jarvis Street (Ramsey) <br />• Construct EB to WB J-Tum approximately 500-feet East of Alpine Drive (Ramsey) <br />• Construct EB to WB J-Tum approximately 500-feet East of Beatty Avenue (Ramsey) <br />• Remove existing Highway 10 median crossings at; <br />• Edison Street (Elk River) <br />• Jarvis Street/Cleveland Street (Elk River) <br />• Adams Street (Ramsey) <br />• Alpine Drive (Ramsey) <br />• M&G Trailer Sales (Ramsey) <br />• Beatty Avenue (Ramsey) <br />• Extend existing pedestrian trail south of Highway 10 from current terminus 500-feet East of Adams Street <br />to Edison Street. <br />• Add pedestrian refuge to Highway 10 median at Jarvis Street. <br />Staff will present a preliminary project layout during the meeting, and will discuss staff s preliminary review <br />comments. <br />Recommendation: <br />Staff will present their project review recommendations during the meeting. <br />Outcome/Action: <br />The Public Works Committee is asked to provide any comments they may have on this project, which will be <br />conveyed to MnDOT along with staffs comments. <br />No files) attached. <br />Attachments <br />Form Review <br />Inbox <br />Reviewed By Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.