Laserfiche WebLink
5. 1. <br />Public Works Committee <br />Meeting Date: 06/17/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Consider Recommending City Council Authorization to Prepare Plans and Specifications for 2026 Pavement <br />Management Program Projects <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council authorization to prepare plans and <br />specifications for 2026 Pavement Management Program Projects, which have not already received said <br />authorization. <br />Background: <br />The proposed 2025 — 2034 Capital Improvement Plan (CIP) identifies the following six (6) street reconstruction <br />improvement projects and two (2) pavement overlay improvement projects for 2026. <br />• IP 26-01 MSA Bunker Lake Boulevard Reconstruction <br />o April 22, 2025, City Council adopted Resolution #25-081 approving an engineering design services <br />proposal from Bolton & Menk to prepare final plans and specifications. <br />• IP 26-02 2026 MSA Pavement Overlay Improvements <br />0 173rd / 175th Avenue between Armstrong Boulevard (CSAH 83) and Nowthen Boulevard (CSAH 5) <br />• IP 26-03 Carol -Rose Acres & Sports Haven Reconstructions <br />• IP 26-04 Countryside Estates Street Reconstructions <br />• IP 26-05 Flintwood Hills 2nd & 3rd Street Reconstructions <br />• IP 26-06 Riverside West Reconstructions <br />• IP 26-07 Section 01 Unplatted Reconstructions <br />oSouth ofCR27 <br />• IP 26-08 2026 Neighborhood Pavement Overlay Improvements <br />Improvement project 26-01 has already received formal City Council approval to prepare plans and specifications. <br />Street segment summaries for the remaining five (5) street reconstructions and two (2) pavement overlay <br />improvements are attached to this case. Additionally, the 2026 Draft Pavement Management Program Project <br />Map is attached to this case. <br />Preliminary Design <br />• On February 18, 2025, the Ramsey Public Works Committee recommended City Council order Requests <br />for Proposals (RFP) for 2026 Pavement Management Program projects, topographic surveys, geotechnical <br />services and utility testing. <br />• On February 25, 2025, the Ramsey City Council adopted Resolution #25-044, ordering Requests for <br />Proposals for said services. <br />• On April 22, 2025, the Ramsey City Council adopted Resolution #25-082, accepting proposals for <br />topographic surveys. Six of the seven surveys were awarded to Bolton & Menk with the seventh awarded to <br />Hakanson Anderson. To date, staff have received one survey per the required schedule in the RFP. The <br />surveys will be used to create an existing ground surface and locate features once project design begins. For <br />Improvement Project 26-01, Bolton & Menk's design services proposal includes a topographic survey of <br />the project area. <br />• May 13, 2025, the Ramsey City Council adopted Resolution #25-101, accepting geotechnical proposals. <br />