My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 06/24/2025
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2025
>
Agenda - Council Work Session - 06/24/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 9:50:38 AM
Creation date
6/23/2025 9:34:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
06/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. 1. <br />CC Work Session <br />Meeting Date: <br />06/24/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Information <br />Title: <br />Review Gravel Road Elimination Program Funding Options <br />Purpose/Background: <br />Purpose: <br />Review funding options for Gravel Road Elimination Program (GREP). <br />Background: <br />Since 2004, the Public Works Committee (PWC) has discussed on numerous occasions the potential conversion <br />of public gravel -surfaced roads to bituminous paved streets to allow for more cost-effective maintenance <br />operations and to prevent the need to replace the road grader. In 2004, the city maintained roughly 12 miles of <br />gravel -surfaced roads. About 10.1 miles of these gravel roads have either been paved since, or are proposed to be <br />paved with private developments. <br />The city currently routinely maintains approximately 1.9 miles of public gravel -surfaced roads. Maintaining these <br />gravel roads during summer months requires using a road grader to remove potholes and "washboards" and <br />restore crowns to the roads so they drain properly. In winter months, the road grader is primarily used to plow <br />snow from gravel roads, though grading the surface may also be required. The city currently owns a 1999 John <br />Deere grader, which is not identified for replacement in the Capital Improvement Program (CIP). If this grader <br />were to be out of service for any length of time, the city would need to rent a replacement temporarily to help <br />maintain our gravel roads. <br />Attached are copies of recent PWC cases and meeting minutes that address Gravel Road Elimination Program <br />(GREP) estimated costs and funding sources. Also attached to this case is a map showing the locations of the six <br />(6) road segments identified for potential conversion from gravel -surfaced roads to paved streets through the <br />GREP. <br />Time Frame/Observations/Alternatives: <br />Timeframe: <br />Staff anticipates up to 60 minutes will be required to present and discuss this case and respond to questions. <br />Observations: <br />In 2011, the City discussed adopting a GREP but a formal policy was never adopted. Then when the City <br />adopted a Special Assessment Policy in 2014, a statement was included in this policy that requires benefiting <br />property owners to pay for 50-percent of the costs to convert a gravel road to a paved street. A copy of the Special <br />Assessment Policy is attached. <br />Until a Gravel Road Elimination Policy is developed and funded, staff will continue to explore and promote the <br />elimination of gravel roads as part of City improvement projects and private developments. <br />Staff are currently working to prepare plans and specifications for the purpose of obtaining bids for alT 2026 <br />Pavement Management Program projects before next spring. Staff would therefore not be able to develop one or <br />more GREP projects in-house for construction in 2026 so any projects proposed for 2026 construction would <br />
The URL can be used to link to this page
Your browser does not support the video tag.