Laserfiche WebLink
CC Regular Session <br />Meeting Date: <br />06/24/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 13. <br />Title: <br />Adopt Resolution #25-140 Ordering Plans and Specifications for Riverside West Street Reconstructions, <br />Improvement Project #26-06 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-140 ordering plans and specifications for Riverside West <br />Street Reconstructions, Improvement Project #26-06. <br />Background: <br />The 2025 — 2034 Capital Improvement Plan (CIP) identifies the streets within the Riverside West subdivision for <br />street reconstruction in 2026. A street segment summary for the project is attached to this case. <br />Project History <br />• On April 22, 2025, the Ramsey City Council adopted Resolution #25-082, accepting and awarding a <br />proposal to Bolton & Menk for topographic survey of the project area. <br />• May 13, 2025, the Ramsey City Council adopted Resolution #25-101, accepting and awarding a proposal <br />to Independent Testing Technologies for a geotechnical report of the project area. <br />• June 17, 2025, the Ramsey Public Works Committee recommended City Council order plans and <br />specifications for said improvements. <br />Project Scope <br />This project proposes to reconstruct the streets within the Riverside West subdivision, generally located along <br />Dolomite Street and 137th Avenue south of Riverdale Drive. The 2026 Neighborhood Overlay Improvements <br />currently includes a mill and overlay of Ebony Street within the Riverside West subdivision. During design, staff <br />will review the projects to determine if Ebony Street is truly an overlay improvement and if it would be more <br />cost-effective to include it with this improvement or the overlay improvement project. The streets are 31-foot <br />wide urban section with concrete curb and gutter, totaling 0.28 miles in length. There is no sidewalk on 137 th <br />Avenue or Dolomite Street, but sidewalk exists along Ebony Street and the Riverdale Park trail crosses 137th <br />Avenue at the west end of the project. Anoka County is improving the trail and pedestrian ramp on the south side <br />of 137th Avenue in 2025. Municipal sewer, water, and storm sewer exist within the project area. Utility testing <br />will be performed during project design, utility improvements are not currently proposed. Storm sewer catch basin <br />grouting and casting resets are typically performed with reconstruction projects. <br />The streets within Riverside West were constructed in 1992, no overlay has been performed on these streets. GPR <br />data taken prior to skim patching shows an average pavement section of 8.6-inches, including 3.1-inches of <br />bituminous and 5.5-inches of aggregate base. <br />The reconstruction is proposed to be an FDR in the CIP. Soil corrections are not anticipated, this will be verified <br />during design and review of the geotechnical report. Spot concrete curb and gutter is anticipated. Staff is aware of <br />a stretch of 137th Avenue in which the curb and gutter is tilting back. This will require replacement of a minimum <br />of 100 feet of curb, and more investigation to determine the cause. Because the existing concrete curb and gutter <br />is generally remaining in -place, adjacent driveway and boulevard impacts should be minimal. <br />Project Timelines <br />