My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/24/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 06/24/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 10:50:21 AM
Creation date
6/24/2025 10:34:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/24/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: <br />06/24/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 18. <br />Title: <br />Adopt Resolution #25-146 Approving Plans and Authorizing Advertisements for Bids for 2025 Pavement Skim <br />Patching, Maintenance Project #25-56 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-146 Approving Plans and Authorizing Advertisements for <br />Bids for 2025 Pavement Skim Patching, Maintenance Project #25-56. <br />Background: <br />In 2023, the number of public streets with numerous deep potholes and surface stripping increased to the point <br />that Public Works staff were only able to maintain a small percentage of the streets in-house. The poor pavement <br />conditions were due in small part to the previous winter's severe weather conditions, but more significantly the <br />poor pavement conditions were due to advanced pavement age and minimal pavement section composition, as <br />well as due to not receiving regular proactive maintenance treatments over the life of the pavement sections. In <br />2023, the city spent almost $1.3M on contracted pavement patching services. <br />Since 2023, the city has expended over $10,000,000 per year on pavement overlay and street reconstruction <br />improvement projects, and on pavement maintenance projects including crack seal, pavement rejuvenation, and <br />pavement skim and spray patching projects. In addition, public works staff continue to patch potholes, as well as <br />mill and overlay pavement segments with pavement stripping confined to tire tracks. Winters have been milder, <br />which has helped reduce pavement damage. All this has helped to significantly reduce the scope and severity of <br />potholes, pavement stripping and other forms of pavement damage on city streets. <br />This spring, staff inspected and identified public street segments within 7 residential neighborhoods that would <br />benefit most from pavement skim patching due to the existing poor pavement conditions, and due to the fact that <br />the majority of these streets are not programmed in the CIP for reconstruction until 2030 or later, with 4 of the <br />street segments not programmed for reconstruction in the CIP at all. All identified street segments total 4.29 <br />miles in length. Attached is a figure showing these street segments, which are located within 12 different areas. <br />In 2025, staff proposes to skim patch street segments within seven (7) of the areas using contracted services. <br />These areas include 1A, 1B, 1C, 2, 3, 4 and 7. Street segment lengths in these 7 areas total 2.41 miles. <br />Based on staff's observations of all contracted skim patching work to date, the patching is anticipated to have a <br />useful life of at least 3 years, and likely much more. To date, this product is holding up very well to plowing, <br />traffic and weather. <br />Some of the streets identified for skim patching in 2025 have deep potholes (deeper than 2-inches) that will <br />require hand patching before skim patching operations commence. Below is a summary of the proposed skim <br />patching process, which is generally the same process followed since 2023. <br />• City staff will patch deepest potholes and sweep streets first. <br />• Contractor will blow debris and water out of remaining potholes using compressed air. <br />• Contractor will apply bituminous tack coat to potholes, fill with hot mix, then compact the mix. <br />• Contractor will apply bituminous tack coat to existing pavement surfaces and patches. <br />• Contractor will skim patch both sides of streets except outer 2 feet to maintain positive drainage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.