Laserfiche WebLink
High Point Street Reconstruction <br />I.P. 25-05 <br />Estimate No. 1 Partial <br />Period Ending <br />May 31, 2025 <br />CONTRACT AMOUNT <br />COMPLETED THIS PERIOD <br />COMPLETED TO DATE <br />Item No. <br />MnDOT <br />No. <br />Item Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Extended Total <br />Quantity <br />Extended Total <br />Quantity <br />Extended Total <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.0 <br />$ 69,655.06 <br />$ 69,655.06 <br />0.5 <br />$ 34,827.53 <br />0.5 <br />$ 34,827.53 <br />2 <br />2101.502 <br />CLEARING <br />ACRE <br />0.10 <br />$ 26,797.80 <br />$ 2,679.78 <br />0.10 <br />$ 2,679.78 <br />0.10 <br />$ 2,679.78 <br />2101.502 <br />GRUBBING <br />ACRE <br />0.10 <br />$ 5,359.50 <br />$ 535.95 <br />0.10 <br />$ 535.95 <br />0.10 <br />$ 535.95 <br />2101.503 <br />REMOVE STORM SEWER <br />LF <br />118 <br />$ 8.58 <br />$ 1,012.44 <br />0 <br />$ - <br />0 <br />$ - <br />2104.502 <br />SALVAGE MAIL BOX SUPPORT <br />EA <br />68 <br />$ 80.39 <br />$ 5,466.52 <br />60 <br />$ 4,823.40 <br />60 <br />$ 4,823.40 <br />2104.503 <br />SAWING BITUMINOUS PAVEMENT - FULL DEPTH <br />LF <br />837 <br />$ 2.25 <br />$ 1,883.25 <br />0 <br />$ - <br />0 <br />$ - <br />2104.503 <br />SAWING CONCRETE PAVEMENT - FULL DEPTH <br />LF <br />389 <br />$ 5.47 <br />$ 2,127.83 <br />0 <br />$ - <br />0 <br />$ - <br />2104.503 <br />REMOVE BITUMINOUS CURB <br />LF <br />17100 <br />$ 0.11 <br />$ 1,881.00 <br />0 <br />$ - <br />0 <br />$ <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT - DRIVEWAYS <br />SY <br />667 <br />$ 4.33 <br />$ 2,888.11 <br />0 <br />$ - <br />0 <br />$ . <br />• <br />2104.504 <br />REMOVE CONCRETE PAVEMENT - DRIVEWAYS <br />SY <br />472 <br />$ 7.28 <br />$ 3,436.16 <br />0 <br />$ - <br />0 <br />$ <br />11 <br />2104.504 <br />REMOVE CONCRETE VALLEY GUTTER <br />SY <br />122 <br />$ 10.73 <br />$ 1,309.06 <br />0 <br />$ - <br />0 <br />$ - <br />12 <br />2104.504 <br />REMOVE GRAVEL SURFACE - DRIVEWAYS <br />SY <br />80 <br />$ 1.07 <br />$ 85.60 <br />0 <br />$ - <br />0 <br />$ - <br />13 <br />2104.504 <br />REMOVE BITUMINOUS FLUME <br />SY <br />122 <br />$ 5.21 <br />$ 635.62 <br />0 <br />$ - <br />0 <br />$ - <br />14 <br />2105.507 <br />GEOTEXTILE FABRIC TYPE 4 <br />SY <br />100 <br />$ 3.22 <br />$ 322.00 <br />0 <br />$ - <br />0 <br />$ - <br />15 <br />2105.607 <br />COMMON EXCAVATION (EV) <br />CY <br />1180 <br />$ 29.28 <br />$ 34,550.40 <br />752 <br />$ 22,018.56 <br />752 <br />$ 22,018.56 <br />iI_2106.607 <br />• <br />HAUL & STOCKPILE RECLAIM MATERIAL (LV) <br />CY <br />3460 <br />$ 6.11 <br />$ 21,140.60 <br />0 <br />$ - <br />0 <br />$ - <br />SU8GRADE PREPARATION <br />RDST <br />88 <br />$ 186.94 <br />$ 16,450.72 <br />0 <br />$ <br />0 <br />$ <br />2123.61 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />20 <br />$ 91.11 <br />$ 1,822.20 <br />5 <br />$ 455.55 <br />5 <br />$ 455.55 <br />19 <br />2130.523 <br />WATER <br />MGAL <br />40 <br />$ 42.88 <br />$ 1,715.20 <br />0 <br />$ - <br />0 <br />$ - <br />20 <br />2211.507 <br />AGGREGATE BASE CLASS 5 - MODIFIED (CV) <br />CY <br />3225 <br />$ 0.11 <br />$ 354.75 <br />0 <br />$ - <br />0 <br />$ - <br />21 <br />2215.504 <br />FULL DEPTH RECLAMATION <br />SY <br />29650 <br />$ 2.17 <br />$ 64,340.50 <br />0 <br />$ <br />0 <br />$ <br />22 <br />2232.504 <br />MILL BITUMINOUS PAVEMENT (2.0") <br />SY <br />15 <br />$ 6.84 <br />$ 102.60 <br />0 <br />$ - <br />0 <br />$ - <br />23 <br />2357.506 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />1715 <br />$ 3.48 <br />$ 5,968.20 <br />D <br />$ - <br />0 <br />$ - <br />24 <br />2360.509 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,C) <br />2.0" <br />TON <br />2770 <br />$ 79.29 <br />$ 219,633.30 <br />0 <br />$ - <br />0 <br />$ - <br />25 <br />2360 509 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) 1.5" <br />TON <br />2075 <br />$ 86.30 <br />$ 179,072.50 <br />0 <br />$ - <br />0 <br />$ - <br />262360.509 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) 2.0" <br />DRIVEWAYS <br />TON <br />80 <br />$ 172.69 <br />$ 13,815.20 <br />0 <br />$ - <br />0 <br />$ - <br />27 <br />2411.502 <br />CONCRETE FLUME _ <br />SY <br />34 <br />$ 107.19 <br />$ 3,644.46 <br />0 <br />$ - <br />0 <br />$ - <br />28 <br />2501.502 <br />15" RC PIPE APRON <br />EA <br />4 <br />$ 1,607.87 <br />$ 6,431.48 <br />D <br />$ - <br />0 <br />$ - <br />29 <br />2501.502 <br />18" RC PIPE APRON <br />EA <br />1 <br />$ 1,607.87 <br />$ 1,607.87 <br />0 <br />$ - <br />0 <br />$ - <br />• <br />2501.502 <br />24" RC PIPE APRON <br />EA <br />1 <br />$ 1,929.45 <br />$ 1,929.45 <br />0 <br />$ - <br />0 <br />$ - <br />31 <br />2501.503 <br />15" RC PIPE SEWER DESIGN 3006 CLASS III <br />LF <br />1247 <br />$ 62.17 <br />$ 77,525.99 <br />0 <br />$ - <br />0 <br />$ - <br />32 <br />2501.503 <br />18" RC PIPE SEWER DESIGN 3006 CLASS III <br />LF <br />720 <br />$ 73.96 <br />$ 53,251.20 <br />0 <br />$ - <br />0 <br />$ <br />33 <br />2501.50321" <br />RC PIPE SEWER DESIGN 3006 CLASS III <br />LF <br />94 <br />$ 94.33 <br />$ 8,867.02 <br />0 <br />$ <br />0 <br />$ - <br />H• <br />• <br />24" RC PIPE SEWER DESIGN 3006 CLASS III <br />LF <br />78 <br />$ 101.83 <br />$ 7,942.74 <br />0 <br />$ <br />0 <br />$ <br />• • • <br />TRASH GUARD FOR 15" PIPE APRON <br />EA <br />2 <br />$ 0.01 <br />$ 0.02 <br />0 <br />$ - <br />0 <br />$ <br />36 <br />2501.602 <br />TRASH GUARD FOR 18" PIPE APRON <br />EA <br />1 <br />$ 0.01 <br />$ 0.01 <br />0 <br />$ - <br />0 <br />$ - <br />37 <br />2501.602 <br />TRASH GUARD FOR 24" PIPE APRON <br />EA <br />1 <br />$ 1,018.31 <br />$ 1,018.31 <br />0 <br />$ - <br />0 <br />$ - <br />38 <br />2503.503 <br />CLEAN AND VIDEO SEWER <br />LF <br />2175 <br />$ 3.22 <br />$ 7,003.50 <br />0 <br />$ - <br />0 <br />$ <br />39 <br />2506.502 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />EA <br />16 <br />$ 3,001.36 <br />$ 48,021.76 <br />0 <br />$ - <br />0 <br />$ <br />Pay Estimate Page 2 t 3 <br />