Laserfiche WebLink
work. The Contractor also affirms they shall be licensed to perform the work in the State of <br />Minnesota, and the work shall comply with all state and local laws. <br />WORKING HOURS: The work shall be carried out during normal working hours so as not to <br />cause any unreasonable nuisance to affected residents and businesses. Under emergency <br />conditions, this limitation maybe waived in writing by the Engineer in conjunction with qualified <br />local authority. Normal working hours for this work are considered to be from 7:00 a.m. to 8:00 <br />p.m., Monday through Saturday. <br />WORK AND STAGGING AREAS: The Contractor shall confine their work activities within <br />City -owned properties and right of way / easement. No equipment shall be left on City streets <br />outside normal working hours. <br />SPECIFICATIONS: Work shall be conducted in conformance with the specifications set forth <br />herein and in accordance with the latest edition of the Minnesota Department of Transportation <br />Standard Specifications for Construction which is incorporated by reference to these <br />specifications. <br />PIPE CLEANING: The Contractor shall clean the pipe to a minimum of 95% capacity. Each run <br />of pipe between structures, a minimum of 80% of the pipe invert must be visible. <br />TRAFFIC CONTROL: All traffic control devices and layouts shall conform and be installed in <br />accordance to the latest addition of the Minnesota Temporary Traffic Control Field Manual. <br />PERMITS: The Contractor shall obtain all necessary construction permits. <br />PAYMENT: Invoices must be submitted to the City on a net 30-day basis, made out to the City <br />of Ramsey Engineering Department including the project description, and must be submitted via <br />email to accountspayab1ecityoframsey.com. Payments may be made by EFT upon request, <br />please submit EFT requests to accountspayab1ecityoframsey.com. An IC 134 form will be <br />required for final payment. <br />BASIS OF PAYMENT: <br />Mobilization — Payment shall be made on a lump sum basis for the mobilization of equipment. <br />Traffic Control — Payment shall be made on a lump sum basis as compensation for all equipment, <br />material, and labor costs required for the installation and maintenance of traffic control measures <br />(signage, barricades, flashers, flaggers, etc.), as directed by the Engineer, for any local traffic <br />disruptions or temporary closures. <br />Clean and Televise Sewer — Payment shall be made on a per lineal foot basis as compensation for <br />all equipment, material, and labor costs required for cleaning, removal and disposal of material, <br />description and video of the sewer lines. <br />Other Items — The cost of any additional equipment, labor, materials, tools and supplies which <br />have not been specifically identified in this section for payment, but are required to complete the <br />project per the plans and specifications shall be considered incidental to the project. <br />4 <br />