My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/08/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 07/08/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 6:39:21 PM
Creation date
7/7/2025 8:28:15 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/08/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />SECTION I <br />REQUIRED IMPROVEMENTS AND FINANCIAL RESPONSIBILITIES <br />1. City Code Compliance. The CITY approves the site plan (the "Site Plan") conditioned on the <br />PERMITTEE developing the Subject Property in accordance with the applicable provisions of <br />City Code. <br />2. Conformance with the Plans. The Subject Property shall be developed in accordance with the <br />final plans (the "Plans") prepared by Elan Design Lab dated May 19, 2025. The Plans remain <br />subject to: (a) City Staff s review and approval of the Plans to, among other things, confirm that <br />the revisions requested in the CITY's review have been made; and (b) such further revisions as the <br />PERMITTEE may propose and the CITY approves. The Plans shall not be attached to this <br />Agreement, but are in the CITY's files. <br />3. Incorporation of All City Code Requirements. That the recitals above and the applicable <br />provisions of the City Charter, Subdivision Code, and Zoning Code of the CITY, as amended to <br />date hereof, are incorporated herein by reference. <br />4. State Building Code Compliance. The structure(s) shall be constructed in accordance with the <br />requirements of the Building Code. <br />5. Fire Lanes. Fire lanes shall be maintained on the Subject Property. The exact locations of these <br />items on the Subject Property shall be as directed by the Fire Chief. The PERMITTEE herein <br />agrees to post "No Parking" signs along driveways in accordance with City Code requirements and <br />in conjunction with the instructions of the Fire Chief. <br />6. Required On -Site Improvements. The PERMITTEE shall construct and install the following <br />site improvements on the Subject Property in accordance with the specifications and location as <br />shown on the Plans. The Required Improvements and the allocated costs therefor are as follows: <br />Required Improvement — Taco Bell <br />Cost <br />75% of Cost <br />Release Amount <br />a. Site work (including lot grading, <br />parking lot and driveway <br />bituminous pavement, traffic <br />signs, light fixtures, fencing, and <br />concrete walkways, curb, and <br />gutter) <br />$103,961.00 <br />$77,970.75 <br />b. Earthwork (including excavation <br />and topsoil placement) <br />$56,099.00 <br />$42,074.25 <br />c. Erosion and sediment control <br />$9,226.00 <br />$6,919.50 <br />d. Storm drainage facilities <br />$45,695.00 <br />$34,271.25 <br />e. Sanitary sewer services <br />$15,259.00 <br />$11,444.25 <br />f. Water services <br />$11,800.00 <br />$8,850.00 <br />g. Landscaping and restoration <br />$34,532.00 <br />$25,899.00 <br />TOTAL <br />$276,572.00 <br />$207,429.00 <br />("Required Improvements") <br />Marvin Development VII, LLC (Taco Bell) <br />Development Agreement <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.