Laserfiche WebLink
City of Ramsey <br />6/4/2025 <br />Page 3 <br />OUR PROCESS — YOUR SUCCESS <br />The Schematic Design phase serves as the critical first step in transforming the city's programmatic <br />needs, vision, and project goals into a tangible design. This phase results in a set of preliminary design <br />documents —including site plans, mechanical schematics, material palettes, preliminary grading plans, <br />and architectural renderings —that begin to physically express the project's intent. <br />A key focus during this stage will be the integration and articulation of the proposed water play feature. <br />The design will explore how this element supports the broader site narrative, contributes to user <br />experience, and connects meaningfully to the future community building. Placement, scale, interaction <br />zones, and seasonal adaptability of the features will be thoughtfully considered to ensure long-term <br />functionality and community value. <br />Our process will be collaborative and iterative, involving close coordination among the design team, <br />including architects, landscape architects, engineers, and the city. Stakeholder input and iterative <br />feedback will shape the evolving design direction, ensuring alignment with both functional needs and <br />aesthetic aspirations. <br />Deliverables at the end of the schematic design phase will provide a clear visual and technical <br />framework that supports early cost estimating and scheduling. These documents serve as the <br />foundation for the following phases of design development and construction documentation, setting the <br />tone for a coherent and successful project execution. <br />PHASE 1: Project Limits Exhibit: <br />— Multi-Purpow Trail <br />/ 10' wide bltumrnous paving <br />• <br />Crushed Granite Trail — <br />8' Crushed Grange Path <br />Regional Trail <br />10' wen. <br />t C ` <br />fie` PHASE 1 • <br />r q WATER PLAY &rag 721-1,4;.2 - PARK CONTEXT <br />PHASE 2 <br />COMMUNITY <br />BUILDING & <br />OUTDOOR PATIOS <br />RAMSEY PARKWAY <br />13361S 2:331N32 <br />DAMON FARBER LANDSCAPE ARCHITECTS 310 S 4th Ave, Suite 7050 Minneapolis, MN 55415 <br />