Laserfiche WebLink
CC Regular Session <br />Meeting Date: <br />07/22/2025 <br />Primary Strategic Plan Initiative: Improve the safety and mobility of transportation corridors. <br />5. 16. <br />Title: <br />Adopt Resolution #25-171 Approving Change Order #1 for Dickenson's Mississippi Estate Street <br />Reconstructions, Improvement Project #25-04 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-171 approving Change Order #1 for Dickenson's Mississippi <br />Estate Street Reconstructions, Improvement Project #25-04. <br />Background: <br />Mississippi River Trail (MRT): <br />The MRT is a long-distance bicycle and pedestrian route which includes both off street trail and on street shared <br />lane usage. The MRT routes through the project as an on street shared lane from Riverdale Drive along Tungsten <br />Street and Rivlyn Avenue. The MRT continues out of the reconstructed portion of Rivlyn Avenue to bituminous <br />trail which crosses King's Island into the City of Anoka. <br />MRT Detour Route: <br />Because of the nature of this street reconstruction project, it's not desirable for bicycles and pedestrian to be <br />routed through the construction site itself and a detour route is necessary. The proposed route and signage layout <br />are attached to this case as part of the Change Order #1 exhibit. The route will be closed between eastern leg of <br />Riverdale Drive and Sunfish Lake Boulevard and the east end of Rivlyn Avenue. <br />Though the project includes traffic control, the specifications do not call out for the trail detour. With the amount <br />of required signage, which will be maintained for the entirety of the project, a change order is necessary and <br />justified per MnDOT Specifications to properly compensate the contractor. <br />Notification: <br />Because the detour route is partially within the City of Anoka, Ramsey City staff has notified the City of Anoka of <br />the detour route. Additionally, Ramsey City staff has posted a notification of the detour on the City's social media <br />accounts. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />Due to the project starting during the week of July 14th, including reclamation of the existing bituminous and <br />removals, the detour route has already been set up prior to City Council approval. In the future, staff will verify <br />traffic control language includes required pedestrian and bicycle detour information. <br />Staff anticipates that the change order cost is similar to what bidding pricing would have been if originally <br />included in the plans and specifications, other than an additional mobilization cost. <br />Alternatives: <br />Motion to adopt Resolution #25-171 approving Change Order #1 for Dickenson's Mississippi Estate Street <br />Reconstructions, Improvement Project #25-04. <br />