Laserfiche WebLink
ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT UNIT <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />Sawcut Bituminous Pavement <br />147 <br />LF <br />$4.00 <br />$ 588.00 <br />110 <br />$ 440.00 <br />2 <br />Remove Bituminous Pavement <br />170 <br />SY <br />$5.00 <br />$ 850.00 <br />100 <br />$ 500.00 <br />3 <br />Remove Metal Culvert <br />48 <br />LF <br />$5.00 <br />$ 240.00 <br />65 <br />$ 325.00 <br />4 <br />Abandon Existing Storm Manhole Dry Well <br />1 <br />EACH <br />$300.00 <br />$ 300.00 <br />1 <br />$ 300,00 <br />5 <br />Connect to Existing Storm Sewer, <br />1 <br />EACH <br />$800.00 <br />$ 800.00 <br />$ <br />6 <br />Common Excavation (P) <br />200 <br />CY <br />$5.00 <br />$ 1,000.00 <br />200 <br />$ 1 000.00 <br />7 <br />15" RCP (Class 5) <br />480 <br />LF <br />$24.00 <br />$ 11,520.00 <br />480 <br />$ 11 520.00 <br />8 <br />18" RCP (Class 5) <br />17 <br />LF <br />$28.00 <br />$ 476.00. <br />17 <br />$ 476.00 <br />9 <br />18" RCP (class 5) with 36" Steel Casing Pipe (Jack/Bore) <br />76 <br />LF <br />$440.00 <br />$ 33,440.00 <br />76 <br />$ 33,440.00 <br />10 <br />27 "Dia. CB (Including Casting) <br />1 <br />EACH <br />$1,800.00 <br />$ 1,800.00 <br />1 <br />$ 1 800.00 <br />11 <br />48" Dia. MH (Including Casting) <br />2 <br />EACH <br />$2,400.00 <br />$ 4,800.00 <br />2 <br />$ 4 800.00 <br />12 <br />Type LV4 Bituminous Wear Course <br />17 <br />TON <br />$90.00 <br />$ 1,530.00 <br />15 <br />$ 1,350.00 <br />13 <br />Type LV4 Bituminous Non -Wear Course <br />16 <br />TON <br />$95.00 <br />$ 1,520.00 <br />15 <br />$ 1,425.00 <br />14 <br />Class 5 Aggregate Base <br />. 53 <br />TON <br />$20.00 <br />$ 1,060.00 <br />50 <br />$ 1 000.00 <br />15 <br />Bituminous Materials for Tack Coat <br />7 <br />GAL <br />$4.00 <br />$ 28.00 <br />7 <br />$ 28.00 <br />16 <br />Silt Fence, Type Machine Sliced <br />100 <br />LF <br />$2.50 <br />$ 250.00 <br />$ _ <br />17 <br />Sod <br />1000 <br />SY " <br />$5.00 <br />$ 5,000.00 <br />$ - <br />18 <br />Turf Establishment <br />0.25 <br />ACRE <br />$1,000.00 <br />$ 250.00 <br />$ <br />19 <br />Traffic Control <br />1 <br />LS <br />$3,000.00 <br />$ 3,00000 <br />1 <br />$ 3 000.00 <br />-168- <br />November 9, 2006 <br />Honorable Mayor 8 City Council <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />RE: Sunfish Lake Blvd, 8 143rd Lane Drainage Improvements <br />Contractor. Sundblad Construction <br />Contract Amount $68,452.00 <br />Award Date: 9/27/06 <br />Completion Date: (Enter Date) <br />Dear Honorable Mayor and Council Members: <br />The following work has been completed on the above - referenced project by Sundblad Construction. <br />Bid Schedule "A" • (Description of Schedule "Al <br />Bid Schedule "A" <br />TOTAL <br />Total Work Completed to Date <br />LESS 5% RETAINAGE: <br />WE RECOMMEND PAYMENT OF: <br />APPROVALS: <br />CONTRACTOR: Sundblad Construction <br />PAY ESTIMATE #1 <br />CITY OF RAMSEY <br />Sunfish Lake Blvd. 143rd Lane Drainage Improvements <br />Total Bid Schedule "A" <br />Certification by Contractor. I certify that all items and amounts are correct for the work completed to date. <br />Signed: <br />Title: Date <br />ENGINEER: HAKANSON ANDERSON ASSOCIATES, INC. <br />Certification by Engineer: We recommend payment for work and quantities as shown. <br />Signed: <br />Tide: Date <br />OWNER: City of Ramsey <br />Signed: <br />Title: Date <br />S:\ MunicipaMram \181\SPECURA181PE PE <br />$ 68,452.00 <br />$ 68,452.00 <br />61,404.00 <br />$ 61,404.00 <br />$ 61,404.00 <br />$ 61,404.00 <br />$ 3,070.20 <br />$ 58,333.80 <br />CONTRACTOR <br />