My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/28/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 11/28/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:55:53 PM
Creation date
11/22/2006 3:10:05 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/28/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br />15153 Nowthen Blvd NW <br />Ramsey, MN <br />PROJECT NUMBER: 060229 <br />PROJECT NAME: Municipal Center \Construction \Contracts \1 - Klamm <br />TO CONTRACTOR: Klamm Mechanical Contractors <br />12409 Co. Rd. #11 <br />Burnsville , MN 55337 <br />The Contract is changed as follows: <br />ASI 28 - Coil Connection Changes <br />FCA 58 - Provide stainless steel ventilation hoods in rooms F251 <br />Armory on the north wall as shown on detail 11/A9.5 and Paul's <br />Woodcraft shop drawing 1B/6.7; and F248 Processing on the south wall <br />as shown on detail 15/A9.5 and Paul's shop drawing 1C/6.8 <br />PR 41- Remove motarized dampers, elbow silencer, and return <br />transfers. Motorized dampers were added by Addendum, but not <br />required under current controls. <br />PR 62 - Add grilles on 3 ducts. Delete RO system, add scatrol water <br />filter unit. <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is <br />BKV Group, Inc. <br />Minne -, MN <br />Date <br />City of Ramsey Municipal Center <br />CHANGE ORDER <br />TOTAL CHANGES: <br />Klemm Mechanical Contractors <br />Burnsville , MN <br />CHANGE ORDER NUMBER: <br />DATE: <br />CONTRACTOR DATE: <br />CONTRACTOR FOR: <br />Add <br />Add <br />Credit <br />Add <br />Add <br />OR(GINAL <br />1151 -12 <br />27-Sep-2006 <br />01-Jun -2005 <br />RM -1151: Mechanical <br />City of Ramsey <br />Rams -y, MN <br />• <br />$3,266.76 <br />$2,723.73 <br />$975.00 <br />$394.42 <br />$5,409.91 <br />$1,806,000.00 <br />$35,577.49 <br />$1,841,577.49 <br />$5,409.91 <br />$1,846,987.40 <br />30- Sep -2006. <br />CONTRACTOR O R <br />eA ti <br />/o —y e,6 <br />Date <br />-227- <br />
The URL can be used to link to this page
Your browser does not support the video tag.