Laserfiche WebLink
CASE # 5 <br />RECOMMENDATION FROM THE PUBLIC WORKS COMMITTEE FOR TRAFFIC <br />SIGN CHANGES ON ALPINE DRIVE AT CSAH 83 AND CSAH 56 <br />By: Steven Jankowski, City Engineer <br />Background: <br />On Tuesday November 21, 2006 the Public Works Committee considered a request by the <br />Anoka County Highway Department for the modification of signage at the intersections of the <br />Alpine Drive /CSAH 83 and Alpine Drive /CSAH 56. The purpose of these changes is to improve <br />the awareness of the STOP conditions on Alpine Drive at these two county trunk highway <br />intersections and increase safety. <br />Attached are figures illustrating the suggested signage changes to the intersections of the Alpine <br />Drive /CSAH 83 and Alpine Drive /CSAH 56 recommended by the Anoka County Highway <br />Department. The primary changes associated with this new traffic control plan for these two <br />intersections include the following: <br />(a) Placing a double set of STOP signs on the City street approaches; with a standard 36 <br />inch sign on the left side and an oversized 48 inch sign on the right; and including Cross <br />Traffic Does Not Stop tags beneath the STOP signs. <br />(b) Installing a double set of symbol style STOP AHEAD signs on both sides of the City street <br />approaches. In the case of eastbound Alpine Boulevard approaching Ramsey Boulevard this <br />will be a replacement of a word style STOP AHEAD sign. These STOP AHEAD signs will be <br />placed at the approach distances recommended in the Uniform Manual on Traffic Control <br />Devices in Minnesota. <br />The changes described in (a) above have been made by the County Highway Department. The <br />changes recommended in portion (b) above are the responsibility of the City. <br />Recommendation: <br />It was the recommendation of the Public Works Committee that the City install the <br />recommended signage changes at the intersections of Alpine Boulevard and CSAH 83 and <br />Alpine Boulevard and CSAH 56 at an estimated cost of $1200. <br />Action: <br />Motion to direct staff to install the recommended signage changes at the intersections of Alpine <br />Boulevard and CSAH 83 and Alpine Boulevard and CSAH 56 at an estimated cost of $1200 with <br />the cost of the signage to be from the Public Work sign account. <br />Reviewed by: <br />Public Works Director/Principal Engineer <br />Street Supervisor <br />Police Chief <br />Fire Chief <br />Finance Officer <br />CC: 11/28/06 <br />-265- <br />