My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 08/12/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 10:14:20 AM
Creation date
8/8/2025 2:54:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/2025
Supplemental fields
Year
%(Da
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. No occupancy permit shall be issued until the PERMITTEE has: (a) constructed vehicular <br />access to the lot, including the installation of at least one layer of bituminous surfacing; and (b) <br />constructed all utilities and storm water facilities this Agreement requires to serve the lot and <br />such utilities and storm water facilities are in place, operational and accepted by the CITY. <br />SECTION III <br />GENERAL <br />11. Survey Monumentation. The PERMITTEE must protect all lot corner stakes and survey <br />monumentation at all lot corners. <br />12. Preconstruction Meeting. The PERMITTEE shall schedule and hold a pre -construction meeting <br />with the CITY prior to commencing site work. <br />13. Boulevard and Area Restoration. The PERMITTEE shall be responsible for restoring all areas <br />disturbed by the development grading operation in accordance with the approved erosion and <br />sediment control plan. The PERMITTEE shall also be responsible for the cost of cleaning any <br />soil, earth or debris from the wetlands within and adjacent to the Subject Property resulting from <br />grading performed in the development of the land. <br />14. Construction Site Maintenance. The PERMITTEE shall adhere to all CITY ordinances relating <br />to, but not limited to, dumping of garbage, site development, construction debris, open burning, <br />etc. <br />15. Construction, Hours and Entrance Signs. The CITY restricts construction and delivery hours <br />to Monday through Saturday 7:00 a.m. to 10:00 p.m. The PERMITTEE is required to provide a <br />sign at each entrance point stating delivery and construction operation hours. Said signs are not to <br />exceed eighty (80) square feet in size and must be clearly visible at all times during the construction <br />period. <br />16. Estimated Cost. It is understood and agreed that cost amounts set forth in this Agreement as <br />Required Improvements, unless specified as fixed amounts, are estimated. The PERMITTEE <br />agrees to pay the entire cost of said improvements including interest, engineering and legal charges. <br />17. Site Plan Approval Expenses. The PERMITTEE agrees that it will pay to the CITY all CITY <br />expenses incurred in the approval of the Site Plan, including, but not limited to administration <br />expenses, engineering and legal fees. Said expenses shall be paid within fifteen (15) days of billing <br />by the CITY and outstanding billings shall be paid prior to issuance of the building permit. Any <br />expenses incurred after the release of the building permit shall also be paid within said fifteen (15) <br />day billing period. Failure to pay the CITY's expenses within the fifteen (15) day billing period <br />will permit the CITY to draw upon any of the escrows required by this contract for payment. <br />18. Reimbursement to the City. The PERMITTEE agrees to reimburse the CITY for all costs <br />incurred by the CITY in defense or enforcement of this Agreement, or any portion thereof, <br />including court costs and reasonable engineering and attorney's fees. <br />19. Invalidity of Any Section. If any portion, section, subsection, sentence, clause, paragraph or <br />phrase of this Agreement is for any reason held to be invalid by a court of competent jurisdiction, <br />such decision shall not affect or void any of the other provisions of this Agreement. <br />CCI Holdings 2, LLC <br />Development Agreement <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.