Laserfiche WebLink
PERSONNEL COMPLEMENT <br />Public Works Superintendent <br />Secretary (Formerly under Engineering) <br />Lead Mechanic/Mechanic <br />Street Supervisor <br />Streets Lead Worker <br />PW Maintenance Worker <br />Temporary - Streets <br />Street Maintenance Total <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />5.00 <br />0.50 <br />10.50 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />1.00 <br />5.00 <br />0.50 <br />11.50 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />1.00 <br />5.00 <br />0.50 <br />11.50 <br />1.00 <br />1.00 <br />3.00 <br />1.00 <br />1.00 <br />8.00 <br />0.50 <br />15.50 <br />1.00 <br />1.00 <br />3.00 <br />1.00 <br />1.00 <br />8.00 <br />0.50 <br />15.50 <br />1.00 <br />1.00 <br />3.00 <br />1.00 <br />1.00 <br />8.00 <br />0.50 <br />15.50 <br />6488/6489 Other Contracted Services <br />Pavement Management Program Funding (Transfer to Pavement Managerr 300,000 <br />Cracksealing/Rejuvenation/Pothole Patching 162,784 200,000 1,272,595 571,622 580,000 630,000 <br />Curb Repair/Tree Removal 15,000 23,255 20,000 20,000 <br />Mlsc 4,243 <br />462,784 215,000 1,272,595 599,119 600,000 650,000 <br />6540 - Heavy Machinery <br />F350 truck with plow (2021 & 2022 total cost) 116,891 103,199 <br />2-Single Axis Plow Trucks - 917,389 <br />Tandem Axle Truck with Plow less trade in $15,000 266,007 <br />Kubota Tractor less trade in $23,000 (Replace #686) <br />Snow Blower less trade in $15,000 (Replace #647) <br />F550 4x4 Truck with 9' 2" V-plow (New) with lift gate 101,176 <br />721 G Front End Loader 232,432 <br />116,891 103,199 266,007 1,250,996 <br />6550-Motor Vehicle <br />1-ton truck 62,772 <br />2-3/4 ton trucks with plows (1 new & 1 replacement) - - 64,066 62,594 <br />Single Axle with dump & Plow less trade in $15,000 (Replace #672) 343,000 <br />F550 Truck less resale $10,000 (Replace #680) 104,000 <br />62,772 64,066 62,594 - 447,000 <br />6580 - Other Equipment <br />Sidewalk Machine 162,723 <br />Snow Pusher Box for Front End Loader 23,500 <br />Trailer for skidsteer 15,102 <br />Toolcat 36,105 <br />Skidsteer 57,372 <br />Tire balancer (1/2 cost other 1/2 police) <br />Asphalt floater <br />ExMark Mower (less $2,500 trade in) <br />Pull behind PTO Mower (Less $1,000 trade in) <br />Trailer Mounted Boom Lift <br />Bobcat T66 Skidsteer <br />Scissor Lift JLG 2646 <br />10-Foot Slide in Removable Salt/Sander Spreader (Truck Mounted) <br />Hydraulic hose Crimping Machine <br />DESCRIPTION OF SERVICES: <br />The Street Maintenance Department is responsible for maintaining city streets, sidewalks, traffic <br />signs, boulevards, ROW mowing and the storm water collection system. <br />9,453 <br />14,405 <br />271,302 23,858 <br />BUDGET HIGHLIGHTS <br />. Staff time redistributed between streets, traffic engr, snow plowing & utilities. <br />• Street Maintenance Improvements (Ex: Rejuvenation) - $50,000 increase <br />• Replace 2013 Ford F350 with Plow & Equip (41680) - $104,000 (net of $10k resale) <br />Upgrade 2013 Ford F350 with Plow & Equip To a Hook Truck (#680) - $55,000 <br />Replace 2016 Sterling Single axle (#672) - $328,000 (net of $15K trade in) <br />57,250 <br />79,248 <br />26,500 <br />13,386 <br />13,165 <br />23,500 189,549 <br />17,500 <br />27,000 <br />44,500 <br />