My WebLink
|
Help
|
About
|
Sign Out
Home
Appendix A: Water Supply Plan
Ramsey
>
Public
>
Comprehensive Plan
>
Appendix A: Water Supply Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2025 9:52:25 AM
Creation date
9/3/2025 9:02:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2040 MUSA - Water System Loop Improvements (2021-2040) <br />Loop LOCATION SIZE LENGTH COST PER COST <br />(IN.) (FT.) FOOT* <br />1 Southwest Loop 12" 19,000 $124 $2,352,313 <br />3,000 LF Constructed in 2017 <br />TOTAL LOOP 1 $2,352,313 <br />2 North Central Loop 12" 28,000 $124 $3,466,567 <br />TOTAL LOOP 2 $3,466,567 <br />3 County Road 57 12" 4,100 INCLUDED IN YEAR 2020 OF CIP <br />4 CSAH 5/157TH AVE NW 12" 2,700 $124 $334,276 <br />TOTAL LOOP 4 $334,276 <br />5 158TH LANE NW 12" 3,400 $124 $420,940 <br />TOTAL LOOP 5 $420,940 <br />6 RIVERDALE BOULEVARD 12" 2,300 INCLUDED IN YEAR 2017 OF CIP <br />SUB -TOTAL $6,574,097 <br />20% CONTINGENCIES FOR UNFORSEEN IMPROVEMENTS $1,314,819 <br />TOTAL IMPROVEMENT COSTS $7,888,916 <br />AVERAGE YEAR FOR 20 YEARS (2017 DOLLARS) <br />INFLATED AT 3% PER YEAR TO YEAR 2021 <br />* INCLUDES 25% INDIRECT COST <br />$394,446 1 <br />$443,952 <br />
The URL can be used to link to this page
Your browser does not support the video tag.