Laserfiche WebLink
2. Subdistrict M4 <br />This subdistrict is located north of Highway 10 and west of Armstrong Boulevard. The <br />trunk sanitary sewer facilities have been modified to reflect the findings of the 2015 <br />Future Business Park study that was completed for this area of the City. Lift station MLS- <br />5 was added to the improvements required for this subdistrict. All project costs have been <br />updated to 2017 unit prices. <br />Because portions of these improvements have been, or are programmed to be constructed <br />in 2017, we included some in the Capital Improvement Plan and others in the future <br />improvements plan. <br />3. Subdistricts R21 Through R25 <br />These subdistricts are located north of Trott Brook in the north central portion of the City. <br />No layout revisions to these trunk extensions were made. All trunk line project costs have <br />been updated to current 2017 unit prices. <br />4. System Extension for 167t' Avenue Future MUSA Study Area <br />The Future MUSA Study Area identifies an area to better understand the feasibility of <br />extending a trunk sewer line to the 167th Avenue/Saint Francis Boulevard (TH 47) land <br />use node. Municipal Water service exists to the area, but Sanitary Sewer does not. The <br />City has a land use goal to revitalize this node and surrounding area, and the availability <br />of Sanitary Sewer is a major variable in future land use decisions. The MUSA boundary <br />does not currently include this area. Findings from this study area will be utilized to <br />influence the City's 2040 Comprehensive Plan Update and discussions with private <br />developers currently proposing certain land use scenarios. <br />C. TRUNK SANITARY SEWER SYSTEM COSTS <br />Attached are the updated cost estimates related to the above revisions, totaling <br />$7,571,929. These costs include 25% for indirect costs such as administration, <br />engineering, legal and financing. Additionally, we have included a 20% contingency for <br />unforeseen improvements which may be required during the study period, for a total cost <br />of $9,086,315 in 2017 dollars. <br />The City's current Capital Improvement Plan was used to determine expenditures for the <br />years 2017 to 2020. For the years 2021 to 2040, the above described costs were spread <br />evenly over the 20 year period, while being inflated at a rate of 3% per year. <br />D. DEVELOPMENTAL IMPACT ON THE COMPREHENSIVE SANITARY SEWER STUDY <br />Actual and projected development within the City of Ramsey since the 2012 Comprehensive <br />Sanitary Sewer Study are summarized as follows: <br />• Actual Total Connections from 2012-2015 are as follows: <br />- 2012: 295 <br />- 2013: 164 <br />- 2014: 66 <br />- 2015: 258 <br />- Avg: 196 <br />City of Ramsey, Minnesota — R16.110056 Page 2 <br />Comprehensive Sewer Plan Update Prepared by Bolton & Menk, Inc. <br />