My WebLink
|
Help
|
About
|
Sign Out
Home
Ramsey 2040 Comprehensive Plan No Appendices (2)
Ramsey
>
Public
>
Comprehensive Plan
>
Ramsey 2040 Comprehensive Plan No Appendices (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 9:15:37 AM
Creation date
9/3/2025 9:12:08 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44 <br /> <br /> <br /> <br />Metropolitan Council Submission <br /> <br />Mississippi West Small Area Plan <br />Mississippi West is a planning area generally south of Highway 10 between Armstrong Boulevard <br />and Bowers Drive. This area is predominantly agricultural and is the location of a potential future <br />river crossing in the form of an extension of Armstrong Boulevard to the City of Dayton. This <br />improvement is not currently in official regional planning documents and is likely at least twenty <br />(20) years away, if not longer. The cities of Dayton and Ramsey choose to plan for this long-term <br />improvement to protect the necessary corridor. <br />Planned land use within this area is predominantly low density residential with a stretch of <br />commercial land use along Highway 10 and an area of natural resource protection along the <br />Mississippi River. Development of this area is likely ten (10) to fifteen (years) in the future due to <br />availability of infrastructure (2015 to 2025 timeframe). Connexus Energy constructed a nineteen <br />(19) acre solar farm within this planning district in 2018. <br />Figure 9: Mississippi West Project Area <br />
The URL can be used to link to this page
Your browser does not support the video tag.