My WebLink
|
Help
|
About
|
Sign Out
Home
Haviland Fields Environmental Assessment Worksheet
Ramsey
>
Public
>
Planning
>
Haviland Fields Environmental Assessment Worksheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2025 10:10:37 AM
Creation date
9/3/2025 9:20:07 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resource <br />Category <br />Resources (Rare <br />Features) <br />Green House <br />Gases <br />Climate Considerations <br />The proposed project is <br />project to generate an <br />increased amount of <br />greenhouse gases than <br />the existing conditions. <br />Pro'ect Information <br />Climate Change Risks <br />and Vulnerabilities <br />Construction equipment <br />and an increased <br />number of residential <br />units will require an <br />increased use of energy. <br />Adaptations <br />• Existing on -site <br />geothermal panels <br />will provide a portion <br />of the sites energy <br />usage. <br />• Roof solar panels to <br />be considered in site <br />design. <br />8. Cover Types <br />Estimate the acreage of the site with each of the following cover types before and after <br />development. <br />Table 3: Cover Types <br />Cover Type Before (Acres) <br />Wetlands and Shallow Lakes (less than 2 meters deep) 3.52 <br />After (Acres) <br />3.52 <br />Wooded/Forest <br />Brush/Grassland <br />Lawn/Landscaping <br />Green Infrastructure (total from Table 4) <br />Impervious Surface <br />Stormwater Pond (wet sedimentation basin) <br />Total <br />Table 4: Green Infrastructure <br />12.4 <br />2.4 <br />9.76 <br />0 <br />7.3 <br />0.12 <br />35.50 <br />5.03 <br />0 <br />11.36 <br />1.56 <br />12.47 <br />1.56 <br />35.50 <br />Green Infrastructure <br />Before (Acres) After (Acres) <br />Constructed Infiltration Systems (infiltration basins, <br />infiltration trenches, rainwater gardens, bioretention <br />areas without underdrains, swales with impermeable <br />check dams) <br />Constructed Tree Trenches and Tree Boxes <br />Constructed Wetlands <br />Constructed Green Roofs <br />Constructed Permeable Pavements <br />Other (describe) <br />r Total <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1.56 <br />0 <br />0 <br />0 <br />0 <br />1.56 <br />Haviland Fields EAW 7 July 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.