Laserfiche WebLink
No sinkholes, unconfined/shallow aquifers, or karst conditions were identified in the project <br />area. The geology of the project site does not result in limitations for the proposed <br />development. <br />a. Soils and Topography - Describe the soils on the site, giving NRCS (SCS) classifications <br />and descriptions, including limitations of soils. Describe topography, any special site <br />conditions relating to erosion potential, soil stability, or other soil limitations, such as <br />steep slopes or highly permeable soils. Provide estimated volume and acreage of soil <br />excavation and/or grading. Discuss impacts from project activities (distinguish <br />between construction and operational activities) related to soils and topography. <br />Identify measures during and after project construction to address soil limitations <br />including stabilization, soil corrections, or other measures. Erosion/sedimentation <br />control related to stormwater runoff should be addressed in response to Item 12.b.ii. <br />According to the Natural Resources Conservation Service (NRCS) Web Soil Survey, there are <br />five soil types within the site, which are generally loamy sands (see Table 7). <br />Table 7. Soil Types <br />Map Unit Map Unit Name <br />Symbol <br />Acres within <br />Project Site <br />Percent of Site <br />D9OB <br />Mc <br />NrD <br />NyA <br />NyC <br />Nymore loamy sand, 1 to 6 percent <br />slopes <br />Marsh <br />Nymore loamy coarse sand, 12 to 25 <br />percent slopes <br />Nymore loamy sand, 0 to 2 percent <br />slopes <br />Nymore loamy sand, 6 to 12 percent <br />slopes <br />1.7 <br />3.3 <br />3.6 <br />4.7% <br />9.3% <br />10.2% <br />13.6 38.4% <br />13.3 37.3% <br />The site earthwork is estimated be a net cut of 2,500 cubic yards based on the excavations <br />for ponding, underground stormwater management, vehicle infrastructure, and building <br />foundations. <br />A National Pollutant Discharge Elimination System (NPDES) permit is required because the <br />project will disturb more than one acre of land. A Stormwater Pollution Prevention Plan <br />(SWPPP) will be prepared. All unpaved areas disturbed during construction will be <br />revegetated in accordance with the standard NPDES permit requirements. In areas with steep <br />slopes, special consideration will be given to prevent erosion during construction, such as <br />erosion control blankets, along with vegetation establishment to permanently stabilize side <br />slopes and any areas impacted as a result of construction. <br />12.Water Resources <br />a. Describe surface water and groundwater features on or near the site below. <br />Haviland Fields EAW 11 July 2023 <br />