My WebLink
|
Help
|
About
|
Sign Out
Home
Haviland Fields Environmental Assessment Worksheet
Ramsey
>
Public
>
Planning
>
Haviland Fields Environmental Assessment Worksheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2025 10:10:37 AM
Creation date
9/3/2025 9:20:07 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name and/or Number: <br />Attachment A <br />Request for Delineation Review, Wetland Type Determination, or <br />Jurisdictional Determination <br />By submission of the enclosed wetland delineation report, I am requesting that the U.S. Army Corps of Engineers, St. Paul District <br />(Corps) and/or the Wetland Conservation Act Local Government Unit (LGU) provide me with the following (check all that apply): <br />n Wetland Type Confirmation <br />n Delineation Concurrence. Concurrence with a delineation is a written notification from the Corps and a decision from the LGU <br />concurring, not concurring, or commenting on the boundaries of the aquatic resources delineated on the property. Delineation <br />concurrences are generally valid for five years unless site conditions change. Under this request alone, the Corps will not address <br />the jurisdictional status of the aquatic resources on the property, only the boundaries of the resources within the review area <br />(including wetlands, tributaries, lakes, etc.). <br />n Preliminary Jurisdictional Determination. A preliminary jurisdictional determination (PJD) is a non -binding written indication <br />from the Corps that waters, including wetlands, identified on a parcel may be waters of the United States. For purposes of <br />computation of impacts and compensatory mitigation requirements, a permit decision made on the basis of a PJD will treat all <br />waters and wetlands in the review area as if they are jurisdictional waters of the U.S. PJDs are advisory in nature and may not be <br />appealed. <br />n Approved Jurisdictional Determination. An approved jurisdictional determination (AJD) is an official Corps determination that <br />jurisdictional waters of the United States are either present or absent on the property. AJDs can generally be relied upon by the <br />affected party for five years. An AJD may be appealed through the Corps administrative appeal process. <br />In order for the Corps and LGU to process your request, the wetland delineation must be prepared in accordance with the 1987 <br />Corps of Engineers Wetland Delineation Manual, any approved Regional Supplements to the 1987 Manual, and the Guidelines for <br />Submitting Wetland Delineations in Minnesota (2013). <br />http://www.mvo.usace.armv.mil/Missions/Regulatorv/DelineationJDGuidance.aspx <br />
The URL can be used to link to this page
Your browser does not support the video tag.