My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/09/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 09/09/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2025 12:33:24 PM
Creation date
9/8/2025 11:10:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/09/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: <br />09/09/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 10. <br />Title: <br />Adopt Resolution #25-207 Approving Additional Geotechnical and Topographic Survey Services for Countryside <br />Estates Street Reconstructions, Improvement Project #26-04 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-207 approving additional geotechnical and topographic survey <br />services for Countryside Estates Street Reconstructions, Improvement Project #26-04. These services are <br />necessary to complete design of the street reconstruction project, including the addition of 0.75 miles of streets <br />within the Wildwood Acres subdivision. <br />Background: <br />The current 2025 thru 2034 10-Year Capital Improvement Plan (CIP) proposes mill and overlay of 0.75 miles of <br />streets within the Wildwood Acres subdivision in 2026. These streets connect to the Countryside Estates <br />subdivision, which is proposed for street reconstruction in 2026. <br />After field review, staff determined the streets within the Wildwood Acres subdivision are no longer a candidate <br />for mill and overlay, but appear to be a good candidate for a reclamation improvement. Due to these streets being <br />connected to the Countryside Estates subdivision, staff proposes combining these subdivisions into one project. <br />Additional geotechnical services, including soil borings is required to inform staff of subsoil conditions, which is <br />essential when designing the pavement section for the reconstructed streets. Staff received a proposal for <br />additional geotechnical services from Independent Testing Technologies, Inc. for a total not -to -exceed amount of <br />$4,930.00. <br />Additional topographic survey of the proposed streets is required to locate all existing site features and update the <br />existing ground surface, which is used as the base for designing the project. Staff received a proposal for <br />additional topographic survey services from Bolton & Menk, Inc. for a total not -to -exceed amount of $5,464.00. <br />By approving these additional services, staff will be able to complete plans and specifications for said <br />improvements in time for winter 2025 bidding. <br />Notification: <br />If City Council accepts proposals, staff will mail letters to property owners within the project areas proposed to be <br />included within the additional improvements. <br />Time Frame/Observations/Alternatives: <br />Alternatives: <br />Motion to adopt Resolution #25-207 approving additional geotechnical and topographic survey services for <br />Countryside Estates Street Reconstructions, Improvement Project #26-04. <br />Funding Source: <br />
The URL can be used to link to this page
Your browser does not support the video tag.