Laserfiche WebLink
PROJECT SPECIFIC SWPPP INFORMATION: <br />I. GENERAL CONSTRUCTION ACTIVITY INFORMATION <br />PROJECT NAME: BROOKSIDE TERRACE <br />PROJECT LOCATION: 15156 NOWHEN BLVD NW <br />RAMSEY, MN 55303 <br />PROJECT CONTACTS <br />OWNER: <br />ENGINEER: <br />RON SIVIGNY <br />1971 208TH LANE NW <br />OAK GROVE, MN 55011 <br />CONTACT: 612-919-4812 <br />BROOKSIDECONSTINC@GMAIL.COM <br />LARSON ENGINEERING, INC. <br />3524 LABORE ROAD <br />WHITE BEAR LAKE, MN 55110 <br />CONTACT: TOM HERKENHOFF, P.E., 320-428-5824, <br />THERKENHOFF@LARSONENGR.COM <br />CONTRACTOR: COMPANY (TBD) <br />ADDRESS <br />CITY, STATE, ZIP <br />CONTACT: NAME, PHONE, EMAIL <br />CITY WHERE WORK WILL TAKE PLACE: RAMSEY, MN <br />COUNTY WHERE WORK WILL TAKE PLACE: ANOKA <br />LATITUDE/LONGITUDE OF APPROXIMATE CENTROID OF PROJECT: 45° 14' 45" N, 93° 24' 57" W <br />PROJECT TYPE (CIRCLE ONE): RESIDENTIAD COMMERCIAL/INDUSTRIAL <br />ROAD CONSTRUCTION RESIDENTIAL & ROAD CONSTRUCTION <br />OTHER (DESCRIBE): <br />DATES OF CONSTRUCTION (ESTIMATED): <br />Construction start date: 09/2025 <br />Construction completion date: 06/2026 <br />PROJECT DESCRIPTION: <br />This project will consist of the construction of a 6 new lots from an existing 3.2 acre parcel. The lots <br />will have access from existing 151st Lane NW. The project will include lot grading, sidewalk, <br />sanitary and water services, stormwater basin, and restoration. <br />PROJECT LIMITS: <br />See the project plans, in particular the grading & erosion control plans, for site disturbance limits. <br />SITE DISTURBANCE SUMMARY (to nearest tenth acre): <br />Total number of acres to be disturbed: <br />Pre -Construction acres of impervious: <br />Post -Construction acres of impervious: <br />Total new impervious acres: <br />II. RECEIVING WATERS <br />2.0 <br />0.1 <br />0.7 <br />0.6 <br />RECEIVING WATERS (WITHIN ONE MILE OF PROJECT PROPERTY EDGE): <br />NAME OF WATER BODY <br />unnamed wetland wetland No No <br />TYPE SPECIAL WATER? IMPAIRED WATER? <br />TOTAL MAXIMUM DAILY LOAD (TMDL) WATERS <br />N/A <br />IDENTIFY WETLAND IMPACTS: <br />1. Will construction result in any potential adverse impacts to wetlands, including excavation, <br />degradation of water quality, draining, filling, permanent inundation or flooding, conversion to a <br />stormwater pond? <br />No. <br />If yes, describe impacts and mitigation measures that were taken to address the impacts and include <br />copies of permits or approvals from an official state wide wetland program issued specifically for this <br />project or site: <br />N/A <br />ENVIRONMENTALLY SENSITIVE AREAS: <br />1. Identifypublic waters where the MN DNR has declared "work in water restrictions"during <br />adjacent <br />fish spawning timeframes: <br />None identified. <br />2. Describe any stormwater mitigation measures that will be implemented, as a result of an <br />environmental review, endangered or threatened species review or archeological site review: <br />N/A <br />W:\2025\Civil\12256081 - Brookside Terrace\3. Working Docs\C. Drawing Files\1XXXX - C600 SWPPP Sheets.dwg <br />PROJECT LOCATION AND RECEIVING WATERS MAP: <br />ve No <br />rthwo <br />4 <br />c Northwest <br />t <br />c <br />w <br />a <br />W <br />• <br />Pelt'J6r grk <br />�f <br />154th Lane rthwest <br />1553r. Lane Northwest <br />• <br />143rd Avenue Northwest <br />ir <br />;sarey.4QN paE lfl09 0)16.7 <br />1.0th Lane Nortaiv,wst <br />I <br />Ramsey <br />Ramsey <br />Elementary <br />school <br />q <br />Sunwood arre• <br />156th Lana North st <br />cl�west <br />i <br />/S5th Lane <br />River's Bend <br />Park <br />S'Llft <br />III. PROJECT PLANS AND SPECIFICATIONS <br />Refer to the project plans, specifications, geotechnical report, and stormwater calculations which depict various <br />features that are relevant to this project. Such features may include, but are not limited to, the following: <br />• Project location and construction limits. <br />• Existing and final grades, including dividing lines and direction of flow for all pre and post -construction <br />stormwater runoff drainage areas located within the project limits. <br />• Soil types at the site. <br />• Locations of impervious surfaces. <br />• Locations of areas not to be disturbed (e.g., buffer zones, wetlands, etc.) <br />• Steep slope locations. <br />• Locations of areas where construction will be phased to minimize duration of exposed soils. <br />• Locations of all temporary and permanent erosion control and sediment control best management practices <br />(BMP's). <br />• Buffer zones as required in item 9.17 and 23.11 of the permit. <br />• Locations of potential pollution -generating activities identified in Section 12 of the permit. <br />• Standard details for erosion and sediment control BMP's to be installed at the site. <br />The anticipated erosion prevention and sediment control BMP quantities needed for the life of this project <br />include the following. These quantities are estimated only and shall be verified by the Contractor. <br />BMP <br />Rock Construction Entrance <br />Silt Fence <br />Inlet Protection <br />Bioroll <br />FES Outlet Rip -Rap <br />Turf Seeding <br />Erosion Blanket <br />SOIL INFORMATION <br />Estimated Quantity <br />1 EA <br />860 LF <br />3 EA <br />580 LF <br />1 EA (size per plan) <br />2.0 ACRE <br />1,250 SY <br />Refer to geotechnical report for site specific soil information. <br />Final Quantity <br />TEMPORARY SEDIMENT CONTROL (SITE SPECIFIC ITEMS) <br />1. Is the project required to install a temporary sediment basin due to 10 or more acres draining to a <br />common location, or 5 acres or more if the site is located within 1 mile of a special or impaired water? <br />No. <br />If yes, describe (or attach plans) showing how the basin will be designed and constructed in accordance <br />with Section 14. <br />N/A <br />2. Will the project include dewatering, basin draining? <br />No. <br />If yes, describe measures to be used to treat/dispose of turbid or sediment -laden water and method to <br />prevent erosion or scour of discharge points (see Section 10 of the permit): <br />N/A. Based on soil boring results, dewatering is not anticipated. <br />3. Will the project include use of filters for backwash water? <br />No. <br />If yes, describe how filter backwash water will be managed on the site or properly disposed of: <br />N/A <br />PERMANENT STORMWATER MANAGEMENT (SITE SPECIFIC ITEMS) SWPPP TRAINING (SECTION 21): <br />1. Will the project result in one acre or more of new impervious surface or result in one acre or more of new <br />impervious in total if the project is part of a larger plan of development? <br />No. <br />If yes, a water quality volume of one inch of runoff from the cumulative new impervious surfaces must be <br />retained on site (Section 15) through infiltration unless prohibited due to one of the reasons in item 16.14 <br />through 16.21. If infiltration is prohibited, identify other methods of stormwater treatment used (e.g. filtration, <br />wet sedimentation basin, regional ponding, or equivalent method): <br />One (1) new infiltration basin is proposed as part of the project to provide the required water quality <br />volume from the total new and fully reconstructed impervious areas. <br />2. Attach design parameters for the planned permanent stormwater management system, including volume <br />calculations, discharge rate calculations, construction details including basin depth, outlet configurations, <br />location, design of pre-treatment devices, and timing for installation. <br />See the project plans and stormwater calculations. <br />3. For infiltration systems, provide at least one soil boring, test pit, or infiltrometer test in the location of the <br />infiltration practice for determining infiltration rates. <br />See the geotechnical evaluation reports contained within the stormwater calculations. Additional <br />in -field testing and geotechnical observations are planned during construction to verify soil <br />characteristics at the proposed basin location. <br />4. For projects that discharge to trout streams, including tributaries to trout streams, identify method of <br />incorporating temperature controls into the permanent stormwater management system. <br />N/A <br />SEQUENCE OF CONSTRUCTION ACTIVITIES <br />1. Install stabilized rock construction entrances. <br />2. Install perimeter erosion control BMP's (silt fence, bio-logs, etc). <br />3. Install temporary construction fencing at infiltration areas and other areas not be disturbed. <br />4. Install inlet protection throughout project area and downstream inlets. <br />5. Construct temporary sediment basins/traps as necessary. <br />6. Strip and stockpile topsoil. <br />7. Complete rough grading of site. <br />8. Stabilize denuded areas and stockpiles. <br />9. Install site utilities. <br />10. Install temporary inlet protection at newly installed catch basins/inlets. <br />11. Install curb and gutter and pavement sections. <br />12. Place topsoil and final grading of areas to be vegetated. <br />13. Remove accumulated sediment from basins / ponds. <br />14. Final grade pond and infiltration areas, including soil de -compaction as specified. <br />15. Complete stormwater basin as -built surveys (as required by project specifications and/or local <br />jurisdictional authorities). <br />16. Complete permanent stabilization including plantings, seeding, and mulch. <br />17. Upon completion of construction activity and satisfactory vegetation establishment, remove remaining <br />temporary erosion and sediment control BMPs. <br />18. Reseed / restore any areas disturbed during BMP removal. <br />SEEDING NOTES AND REQUIREMENTS: <br />1. The Contractor is responsible to salvage and preserve existing topsoil as necessary for final stabilization. <br />All topsoil to be salvaged and re -used shall be processed as necessary to meet project specifications. <br />2. Prior to final seeding, all areas to be vegetated shall be scarified/decompacted and amended as specified <br />in the plans and specifications. <br />3. Unless otherwise noted, all seed mixes and applications shall be in accordance with MNDOT Seeding <br />Manual, latest edition. <br />4. See the project plans and specifications for seed mixtures, mulch, slope stabilization, and all other <br />landscaping requirements. <br />FINAL STABILIZATION: <br />Ensure Final Stabilization of the site. Final Stabilization is not complete until all of the following requirements are <br />complete: <br />1. All soil disturbing activities at the site have been completed and soils are stabilized by a uniform perennial <br />vegetative cover with a density of 70 percent of its expected final growth over the entire pervious surface <br />area, or other equivalent means necessary to prevent soil erosion under erosive conditions. <br />2. The permanent stormwater management system is constructed and operating as designed. Temporary or <br />permanent sedimentation basins that are to be used as permanent water quality management basins <br />have been cleaned of any accumulated sediment. All sediment has been removed from conveyance <br />systems and ditches are stabilized with permanent cover. <br />3. All temporary synthetic and structural erosion prevention and sediment control BMPs (such as silt fence, <br />bio logs, etc.) have been removed from the site. BMPs designed to decompose on site may be left in <br />place. <br />4. Upon correction of all erosion and sediment items and achieving vegetative cover, temporary erosion <br />prevention and sediment control BMPs will be removed and properly disposed/recycled. <br />5. Within 30 days of final stabilization, a notice of termination shall be submitted to the MPCA (see Permit <br />Termination Req's) . <br />GENERAL SWPPP NOTES: <br />1. The Contractor and all Subcontractors involved with construction activity that disturbs soil, or implements <br />a pollution control measure as part of the Storm Water Pollution Prevention Plan (SWPPP) for this project, <br />must comply with the requirements of the National Pollution Discharge Elimination System (NPDES) / <br />State Disposal System (SDS) Program, General Permit MNR10001, Dated August 1, 2023. <br />2. The Contractor and all Subcontractors shall be responsible for reviewing the NPDES Permit in its entirety, <br />to ensure that all SWPPP measures are in place and permit requirements fulfilled throughout the duration <br />of the project. <br />SWPPP PREPARER: COMPANY: <br />CONTACT: <br />COURSE, INSTRUCTOR: <br />TRAINING ENTITY: <br />EXPIRATION: <br />SWPPP CONTACT: CONTRACTOR: <br />CONTACT: <br />COURSE, INSTRUCTOR: <br />TRAINING ENTITY: <br />EXPIRATION: <br />LARSON ENGINEERING, INC. <br />TORRY KRAFTSON, 651-260-5159, <br />TKRAFTSON@LARSONENGR.COM <br />DESIGN OF SWPPP, ONLINE COURSE <br />UNIVERSITY OF MINNESOTA <br />MAY 31, 2027 <br />(TBD) <br />NAME, PHONE, EMAIL <br />This SWPPP was prepared by personnel certified in design of construction SWPPP's as listed above. Copies of <br />respective certifications are available upon request. In accordance with Section 21 of the permit, the following <br />individuals must receive training, and the content and extent of the training is commensurate with the individual's <br />job duties and responsibilities with regard to activities covered under the permit: <br />a. Individuals preparing the SWPPP for the project. <br />b. Individuals overseeing implementation of, revising and/or amending the SWPPP, and individuals <br />performing inspections for the project. <br />c. Individuals performing or supervising the installation, maintenance and repair of BMP's. <br />Individuals must receive training from local, state, federal agencies, professional organizations, or other entities <br />with expertise in erosion prevention, sediment control, permanent stormwater treatment and the MN <br />NPDES/SDS Construction Stormwater permit. Individuals shall attend a refresher -training course every three (3) <br />years. <br />SWPPP IMPLEMENTATION RESPONSIBILITIES: <br />1. Unless otherwise directed, the Contractor shall obtain the MPCA-NPDES permit. Contractor shall be <br />responsible for all fees pertaining to this permit. The SWPPP shall be kept onsite at all times. <br />2. The Owner and Contractor are Permittee(s) as identified by the NPDES permit. <br />3. The Contractor shall be responsible for all on -site implementation of the SWPPP, including all <br />Subcontractor activities. <br />4. The Contractor shall provide knowledgeable and experienced person(s) in the application, installation, <br />and maintenance of Erosion and Sediment Control BMP's throughout the project. <br />5. The Contractor shall provide person(s) meeting the training requirements of the NPDES permit to conduct <br />inspection and maintenance of all erosion prevention and sediment control BMP's in accordance with <br />permit requirements. One of these individuals must be available for an on -site inspection within 72 hours <br />upon request by the MPCA. <br />6. The Contractor shall provide training documentation for all individual(s) required by the permit. This <br />training documentation shall be recorded in the SWPPP prior to construction, or as soon as personnel for <br />the project have been determined. Documentation shall include: <br />a. Names of personnel associated with the project required to be trained (as listed above and <br />under Section 21 of the permit). <br />b. Dates of training, name of instructor, and entity providing training. <br />c. Content of training course or workshop including number of hours of training. <br />INSPECTIONS AND MAINTENANCE: <br />1. The Contractor shall provide person(s) meeting the training requirements to conduct inspection and <br />maintenance of all erosion prevention and sediment control BMP's under this project in accordance with <br />permit requirements. <br />2. An example MPCA construction stormwater checklist can be found at the link below. Note: This template <br />inspection report does not address all aspects of the NPDES Permit. The completion of this checklist <br />does not guarantee that all permit requirements are in compliance; it is the responsibility of the <br />Permittee(s) to read and understand the full permit requirements. <br />https://www. pca.state.mn.us/sites/default/files/wq-strm2-36.docx <br />RECORDS RETENTION: <br />The SWPPP, including all changes/amendments, and inspections and maintenance records shall be kept on <br />site during normal working hours by individuals who have operational control of that portion of the site. <br />All Owner(s) shall keep the SWPPP, along with the following additional records, on file for three (3) years after <br />submittal of the NOT as outlined in Section 4: <br />a. The Final SWPPP; <br />b. Any other stormwater related permits required for the project; <br />c. Records of all inspection and maintenance conducted during construction; <br />d. All permanent operation and maintenance agreements that have been implemented, including all <br />Right -Of -Way, Contracts, Covenants, and other binding requirements regarding perpetual maintenance; <br />and <br />e. All required calculations for design of the temporary and permanent stormwater management systems. <br />O .s$T) <br />V♦ w <br />i <br />• p <br />J W <br />Lr) <br />-o <br />t0 <br />0 <br />4) <br />0 <br />J <br />N <br />L() <br />CO <br />0 <br />LO <br />Ln <br />z <br />a) <br />r. <br />to <br />J <br />t <br />a) <br />m <br />a) <br />0 <br />0 <br />0) <br />o C <br />N N <br />rn 0 <br />• L <br />co (13 <br />• <br />a) <br />0 <br />Wz <br />U� <br />W <br />Et 2 <br />cl <br />W0 <br />W <br />W <br />O <br />(n� m <br />W <br />O � <br />O ° <br />M E W <br />I hereby certify that this plan, <br />specifications or report was prepared <br />by me or under my direct supervision <br />and that I am a duly Licensed <br />Professional Engineer under the laws <br />of the State of Minnesota. <br />First M. Last, P.E. <br />Date: 08.13.25 Lic. No.: 25520 <br />Rev. Date Description <br />08.13.25 City Comments <br />Project #: 12256081.000 <br />Drawn By: TRK <br />Checked By: TJH <br />Issue Date: 08.13.25 <br />Sheet Title: <br />SWPPP <br />Sheet: <br />