|
•
<br />•
<br />4
<br />a •
<br />•
<br />4
<br />• a.
<br />4
<br />d
<br />,a
<br />AI •
<br />• a
<br />•
<br />•a
<br />4 .
<br />•
<br />•
<br />4 • •
<br />.a • •
<br />4 •
<br />4.
<br />4-
<br />a
<br />• a
<br />• •a
<br />• • •
<br />•
<br />.d , a ••
<br />I
<br />1'.
<br />zi
<br />7
<br />--FOPS--`FOP F(P
<br />]=--
<br />--FOP _ FOP— -FGF
<br />• GAS
<br />W:\ 2025\ 250341\ CADD DATA\ LANDSCAPE\ dwg Sleet Files\ L1-1
<br />I I
<br />I I
<br />I I
<br />I I
<br />I I
<br />I I
<br />SMH
<br />•
<br />116
<br />7
<br />•
<br />FOP FOP `OP FOP
<br />FOP C4-I-
<br />4(114
<br />I1450/
<br />CI
<br />FOP - = ---FAP
<br />111" FOPP---- -I.
<br />_ 1 0 —=
<br />Fza
<br />FOP
<br />116-
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />/
<br />/ 30 1 //
<br />cu
<br />/
<br />41
<br />r:I /
<br />luj
<br />125
<br />9
<br />157
<br />C) \STE Pg
<br />FOP
<br />/ / /- LOADIN G
<br />///
<br />1-56
<br />— -- GAS
<br />BITUMINOUS
<br />0 v J v
<br />L. —� — — — �,mi
<br />/
<br />GAS AS GAS/ -7,AS GAS GAS GAS GAS GAS GAS �GAS� \AS �A3-= --GAS-- S SAS
<br />i
<br />p.�
<br />GAS GAS
<br />GAS GAS - -
<br />FOP FOP 1-- F -- FOP FOP SOP-- FOP--� —FOP=� - P �- =FOP — TOP �_ FOP- _ _ _ -FOP- S- - FgF®- - - -FOP GAS = GAS =
<br />\ GAS - GAS-Q�A3fl�=GR3-BR"6�S-F6P-6A5�P FOP FOP
<br />G7{S_-��a$_o - - GAS GAS GAS- - GAS GAS GAS H GAS `
<br />99•L':-// /////////_///T!/-/-/ /-,/,4-.L/_'/////// //�//••/ /- � /
<br />el-
<br />•
<br />•
<br />*in
<br />mle
<br />\.. \ ,.....
<br />1 lase
<br />-
<br />VA g
<br />•
<br /><46
<br />•
<br />155 0/
<br />if/ r-PoP
<br />V
<br />*41
<br />•
<br />0
<br />BITUMINOUS
<br />0
<br />orgig
<br />CL
<br />0
<br />14.
<br />co
<br />•
<br />an I
<br />WI
<br />•
<br />tyy
<br />zz
<br />f II
<br />BITUMINOUS
<br />GAS GAS GAS GAS -
<br />in
<br />•
<br />6
<br />•
<br />•
<br />•
<br />o
<br />0
<br />•
<br />/ //
<br />FOP -m-EQP
<br />FOP FOP FOP
<br />, , , , 77
<br />17407 11,1k 'r#
<br />‘, // / w 4, . 46.,
<br />, , ,
<br />, /, /, ii, // /, ,
<br />, , /, /, , , , , , , , , kr
<br />, , , , , , , , , , , ,
<br />, , , , , , ,
<br />, , , , , ,
<br />, , , , , , , ,,,,,,,,,,,_,I,
<br />, , , , , , , , , , , , , , , , , , 4 / W,..7.../
<br />////• /, //_//iiiii./ I larir/_/_/ / 4kd r, /1 1 • 1 • // ., // // J // ,/ //
<br />• I• LA tr
<br />I 1
<br />„, / I 11
<br />1 (
<br />jx.rul
<br />an
<br />0
<br />/ / /I/ / / 6,, / :1/76./1; 6 .
<br />-/ / / / / / / / / / / /1 / / / / PO / 1/1 ;co/ /:
<br />1/ / / / / / / / / 1 / / / Pi
<br />\\\\\\\\.\\\\\\\, . , 1 \.21 \ 7\ i\( Ka , \\\\\\N\\\\\\\1_11 1 1 1 1 1 : 1 1 //. : /// /// /// /// : : )/ I : : 1 1 2,' 1 /, 71 T: i 0 i
<br />*\\*\ C* F\\ N A /kb t,N\Fcsk\*\\\\\ Al\\ FA 1
<br />\ /////////./////// ////::‘: 1
<br />-4-1--1-r.. th--7-2,r- — J Li- - . .. 110,///////////////q/////////7//://1
<br />-ri",,..>„...5.,/,,,,,,,://z_z___,_,,,,,,,,i,,,>,,i,„\,,,:
<br />L,.
<br />_Fr,,,
<br />„,,. ,
<br />\\\\\\\ bt,\\\,\\\\\Q
<br />\\\\\\\,\\\\,*.,\\*\,\Ac,\\ ' M
<br />t, ItiT.74.111_11411-111 — ,,_,..._,_.,_,:i_,,,,,:,-,-,-,.;,,, 6
<br />1- /_/ / / / / /i4s.,,,.\/ / /: / //,,,
<br />TilirTil_Td1 41.LIL=H44zT
<br />fii.ikr!-1,1711,1741-17,1-1 1 TEL 'T 1 T--
<br />CL
<br />0
<br />0
<br />a.
<br />0
<br />0
<br />ROAD FRONTAGE PLANTING REQUIREMENTS:
<br />FOR EVERY 35 FEE! OF PUBLIC ROAD FRONTAGE, ON E OVERSTO RY
<br />TREE S-IALL BE PLANTED ADACH\lT TO THE ROAD RIGHT-OF-WAY ON
<br />PRIVATE PROPERTY. THFS.P PLAN TIN GS ARE CRED ITED TOWARD THE
<br />MINIMUM PLANTING REQUIREMENTSFORTHEDISTRICT.
<br />TOTAL PUBLIC ROAD FRONTAGE
<br />TOTAL FRONTAGE TREES REQUIRED:
<br />EXISTING FRONTAGE TREESTO REMAIN:
<br />PROPOS-I ) FRONTAGE TREES:
<br />TOTAL FRONTAGE TREES PROVIDED:
<br />960 LF
<br />28
<br />25
<br />15
<br />48
<br />PARKING LOT LANDSCAPING REQUIREMENTS:
<br />ALL PARKING LOTSARE REQUIRED TO PROVIDE INTERNAL AND/OR
<br />ONETrdi PER EVERY TEN PARKIN G SPACES.
<br />EVERY OVERSTORY TREE PLANTING SHALL BE PROVIDED WITH A
<br />PLANTING AREA OF AT LEAST 162 SQUARE FEET (EQUIVALENT OF
<br />A NINE FOOT BY 18 FOOT PARKING STALL).
<br />ACCEI-31 ABLE GROU ND COVER MATERIALS INCLUDE SOD,
<br />MULCH, AND OTHER NATURAL GROUND LAN D APING ROCK
<br />AND PLASTIC UNDERLAYMENT IS PROHIBITED IN PLANTING
<br />TOTAL NUMBER OF PARKING STALLS:
<br />REQUIRED NUMBER OF PARKING LOT TREES:
<br />EXISTING NUMBER OF PARKING LOT TREES.
<br />PROPOSU) NUMBER OF PARKING LOT TREES:
<br />TOTAL PROVIDED PARKING LOT TREES:
<br />269
<br />27
<br />8
<br />35
<br />43
<br />MULTIPLY THETHE I M PERVIOUS AREA/STE AREA RATIO BY THE
<br />REQU IRED CANOPY COVER SQUARE FOOTAGE FOR THE PRO,ECT
<br />AREA
<br />IMPERVIOUSAREA:
<br />SITE AREA:
<br />RATIO:
<br />316,39 SF
<br />500,962 SF
<br />.63
<br />REQUIRED CANOPY COVER: 116,504 SF (.63 x184,926)
<br />EXISTING CANOPY COVER:
<br />PROPOSED CANOPY COVER:
<br />TOTAL CANOPY COVER PROVIDED:
<br />PLANT SCHEDULE
<br />SYMBOL I CODE I BOTANICAL NAME
<br />DECIDUOUS TREES
<br />AE-G AESCULUS GLABRA
<br />GY-D GYMNOCLADUS DIOICA
<br />QU-M QUERCUS MACROCARPA
<br />UL-A ULMUS AMERICANA 'PRINCETON'
<br />EVERGREEN TREES
<br />PS
<br />PINUS STROBUS
<br />TO THUJA OCCIDENTALIS
<br />ORNAMENTAL TREES
<br />AM-G
<br />SHRUBS
<br />0 AR-E
<br />CO-F
<br />SP-L
<br />48,670 SF
<br />68,649 SF
<br />117,319 SF
<br />'COMMON NAME
<br />OHIO BUCKEYE
<br />COMMON HACKBERRY
<br />IMPERIAL HONEYLOCUST
<br />KENTUCKY COFFEETREE
<br />BURR OAK
<br />PRINCETON ELM
<br />BLACK HILLS SPRUCE
<br />WHITE PINE
<br />EASTERN WHITE CEDAR
<br />AMELANCHIER X GRANDIFLORA 'AUTUMN BRILLIANCE' AUTUMN BRILLIANCE SERVICEBERRY
<br />ARONIA MELANOCARPA ELATA
<br />CORNUS SERICEA 'ARTIC FIRE'
<br />PHYSOCARPUS OPULIFOLIUS 'LITTLE DEVIL' TM
<br />SPIREA JAPONICA 'LITTLE PRINCESS'
<br />CONIFEROUS SHRUBS
<br />GRASSES
<br />CA-K CALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER'
<br />SYMBOL CODE BOTANICAL NAME
<br />GROUND COVERS
<br />PI1H DS-M DRY SWALE/POND MIX
<br />RM-1
<br />WARNING:
<br />GLOSSY BLACK CHOKEBERRY
<br />ARCTIC FIRE DOGWOOD
<br />LITTLE DEVIL NINEBARK
<br />LITTLE PRINCESS SPIREA
<br />1MINT JULEP JUNIPER
<br />FEATHER REED GRASS
<br />COMMON NAME
<br />MN DOT WET DITCH SEED MIX
<br />MNDOT SOUTHERN TALLGRASS ROADSIDE MIX
<br />HARDWOOD MULCH
<br />ROCK MULCH -TYPE 1
<br />TURF SOD
<br />CALL BEFORE YOU DIG!
<br />Gopher State One Call
<br />TWIN CITY AREA: 651-454-0002
<br />THE CONTRACTOR SHALL BE RESPONSBLE FOR CALLING FOR LOCATIONSOF ALL
<br />EXISTING UTILITIES THEY SHALL COOPERATEWITH ALL UTILITY COMPANIES IN
<br />MAINTAINING THEIRLLINICEAND / OR RELOCATION OF LINES.
<br />TH E CO NTRACTO R SHALL CO N TACT GO PH ER STATE ON E CALL AT 651-454-0002 AT
<br />LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
<br />CABLES, CONDUITS PIPES, MAN HOLES, VALVES OR OTH ER BURIED STRUCTURES BEFORE
<br />DIGGING. TH E CO NTRACTOR SHALL REPAIR OR REF'LACE TH E ABOVEWH EN DAMAGED
<br />DURING CONSTRUCTION AT NO COST TO THE OWN ER.
<br />B&B
<br />5 GAL 24" HGT
<br />5 GAL 24" HGT
<br />5 GAL 24" HGT
<br />5 GAL 24" HGT
<br />1 GAL
<br />30
<br />0
<br />0
<br />cC
<br />0
<br />u_
<br />0
<br />SCALE IN FEET
<br />60
<br />por)e
<br />#11‘ DESIGN
<br />GROUP
<br />POPE DESIGN GROUP
<br />767 N. EUSTIS STREET, SUITE 190
<br />ST. PAUL, MINNESOTA 55114
<br />651.642.9200
<br />WWW.POPEDESIGN.COM
<br />2025 OFFICE
<br />AND
<br />PRODUCTION
<br />ADDITION
<br />6151 140TH AVE NW
<br />RAMSEY, MN 55303
<br />• LOUCKS
<br />PLANNING
<br />CIVIL ENGINEERING
<br />LAND SURVEYING
<br />LANDSCAPE ARCHITECTURE
<br />ENVIRONMENTAL
<br />12755 Highway 55, Suite R100
<br />Plymouth, MN 55441
<br />763.424.5505
<br />LOUCKS PROJECT NO. 250341
<br />OVERALL
<br />LiA
<br />I hereby certify that this plan, specification, or
<br />report was prepared by me or under my direct
<br />supervision and that I am a duly Licensed
<br />State of Minnesota.
<br />COMMISSION NO:
<br />DRAWN BY:
<br />CHECKED BY:
<br />SHEET
<br />JORDAISMDIEDDGEOEIliS PEA
<br />11726-25090
<br />Author
<br />Checker
<br />L2-1
<br />TRUE SHEET SCALE
<br />
|