Laserfiche WebLink
CC Regular Session <br />Meeting Date: <br />09/23/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 14. <br />Title: <br />Adopt Resolution #25-230 Approving Construction Contingency Expense No. 10 for Improvement Project <br />#21-09, Centralized Water Treatment Plant <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-230 approving Construction Contingency Expense No. 10 for <br />Improvement Project #21-09, Centralized Water Treatment Plant. <br />Background: <br />Construction costs for the Water Treatment Plant (WTP) include a construction contingency allowance of <br />$950,000 to pay for new items identified during construction that were not contemplated during the design <br />process or for items that the owner, engineer, or contractor(s) propose to revise during construction. This <br />construction contingency allowance is equal to approximately 3-percent of the overall construction bid price. Any <br />unused allowance funds will be deducted from the final payment. <br />The attached letter from Resident Project Representative Ryan Hanson with Advanced Engineering and <br />Environmental Services, Inc. (AE2S), the City's contracted project engineer, identifies those items approved <br />under previous Construction Contingency Expense No.'s 1 through 9, as well as the four (4) items proposed to be <br />adjusted during construction as part of Construction Contingency Expense No. 10. <br />No extension of time is being requested as part of Construction Contingency Expense No. 10. However, the <br />contractor may decide at a later date to request an extension of time for any of the Construction Contingency <br />Expenses. If a time extension request is made, it will be presented at a later date in the form of a formal Change <br />Order request. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />The modifications proposed with Construction Contingency Expense No. 10 will serve to reduce maintenance <br />costs and improve operating conditions within the WTP over the life of the plant. <br />Alternatives: <br />Motion to adopt Resolution #25-230 approving Construction Contingency Expense No. 10 for Improvement <br />Project #21-09, Centralized Water Treatment Plant. <br />Funding Source: <br />