My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/23/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 09/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 2:02:01 PM
Creation date
9/22/2025 2:50:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: <br />09/23/2025 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 14. <br />Title: <br />Adopt Resolution #25-230 Approving Construction Contingency Expense No. 10 for Improvement Project <br />#21-09, Centralized Water Treatment Plant <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #25-230 approving Construction Contingency Expense No. 10 for <br />Improvement Project #21-09, Centralized Water Treatment Plant. <br />Background: <br />Construction costs for the Water Treatment Plant (WTP) include a construction contingency allowance of <br />$950,000 to pay for new items identified during construction that were not contemplated during the design <br />process or for items that the owner, engineer, or contractor(s) propose to revise during construction. This <br />construction contingency allowance is equal to approximately 3-percent of the overall construction bid price. Any <br />unused allowance funds will be deducted from the final payment. <br />The attached letter from Resident Project Representative Ryan Hanson with Advanced Engineering and <br />Environmental Services, Inc. (AE2S), the City's contracted project engineer, identifies those items approved <br />under previous Construction Contingency Expense No.'s 1 through 9, as well as the four (4) items proposed to be <br />adjusted during construction as part of Construction Contingency Expense No. 10. <br />No extension of time is being requested as part of Construction Contingency Expense No. 10. However, the <br />contractor may decide at a later date to request an extension of time for any of the Construction Contingency <br />Expenses. If a time extension request is made, it will be presented at a later date in the form of a formal Change <br />Order request. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />The modifications proposed with Construction Contingency Expense No. 10 will serve to reduce maintenance <br />costs and improve operating conditions within the WTP over the life of the plant. <br />Alternatives: <br />Motion to adopt Resolution #25-230 approving Construction Contingency Expense No. 10 for Improvement <br />Project #21-09, Centralized Water Treatment Plant. <br />Funding Source: <br />
The URL can be used to link to this page
Your browser does not support the video tag.