Laserfiche WebLink
AAGNEYCON5TRUCTION <br />COMMERGhL R INDUSTRIAL CONTRACTORS <br />gdnr Ar-------,mapp 1401 Park Road - Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />Proposal <br />SEND TO <br />Company name From <br />AE2S Noah Pundsack <br />Attention Date: 05/22/2025 <br />Abigail Bowman <br />E-mail Phone Magney Proposal # 041 <br />Abigail.Bowman@ae2s.com (763) 463-5036 RFP No. 019 Revised Plate Settler Flow Meter Locations <br />Urgent LJ Please comment <br />Total pages, including cover: 3 <br />X❑ Please review ❑ For your information <br />COMMENTS <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Abby, <br />Magney Construction, Inc. is pleased to present the following quotation to provide the necessary labor, <br />material and equipment to move the two 3" flow meters SLP1 & 2-SL-FE-1 to an elevation below the grating <br />creating a P-Trap to ensure proper readings. See the costs associated with this change summarized below. <br />Labor: Additional Labor For Spools, Fittings & Connections $ 1,623.18 <br />Material: Additional Costs For Added Pipe Spools, Fittings, N,B&G, (incl. T&S) $ 4,006.21 <br />Equipment: Misc. Small Tools and Equipment (10% of Labor) $ 162.32 <br />Subcontractor: Fresh Blast Painting - Additional Painting (see attached) $ 163.24 <br />Subtotal $ 5,954.95 <br />General Contractor's Overhead $ 876.92 <br />Bond & Insurance premiums $ 89.32 <br />Lump Sum Total: $ 6,921.19 <br />'Additional Working Days Required for this Change (Including material lead time): I 0.0 <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />Noah Pundsack <br />Project Engineer Accepted By Date <br />Page 1 of 1 <br />