Laserfiche WebLink
Erickson Electric <br />Material Cost <br />Material $ 1,672.42 <br />credit $ (217.60) <br />Tax 7.625% $ 127.52 <br />Material MU 10% $ 167.24 <br />Permit $ - <br />Labor Rate/hr Hours <br />PM/Estimator $190 1 $ 190.00 <br />Wireman $180 7.2 $ 1,296.00 <br />Credit $180 -2.6 $ (486.00) <br />Overtime 1-1/2 $270 0 $ - <br />Overtime double time $360 0 $ - <br />Labor MU 10% $ 100.00 <br />Subcontractor <br />Mat. $ - <br />labor $ - <br />Markup @ 5% $ - <br />Subtotal $ 2,849.58 <br />Bond $ - <br />Total cost for this chance $ 2,849.58 <br />