Laserfiche WebLink
MAGNEYCONSTRUCTION <br />-�-'-9CIAL 6 INDUSTRIAL CONTRACTORS <br />41401 Park Road - Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />Request for Information No. 066 <br />Ramsey Water Treatment Plant <br />City of Ramsey, MN <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />General Contractor: <br />Magney Construction, Inc. <br />1401 Park Road <br />Chanhassen, MN 55317 <br />Engineer: <br />AE2S <br />6901 E Fish Lake Road <br />Maple Grove, MN 55369 <br />Date Created: 07/07/2025. <br />Author: Noah Pundsack <br />Reference: Generator Load Center <br />Drawing Number: <br />Question: <br />Electrical Coordination <br />Company: Magney Construction, Inc. <br />Specification: <br />Date Required: 07/17/2025 <br />Conduit Schedule and panel schedule indicate generator load center is 60-amp 1202/208 single phase. The <br />Generator load center Main Breaker is 150-amp. This is feeding multiple tank heaters and battery chargers. <br />Is 60-amp feed enough? <br />Please advise. <br />Answer: Generator manufacturer has confirmed that the load on the <br />panel would be a maximum of 60amps. To allow for additional <br />capacity, please increase the size of the feeder circuit to 100amps. <br />Date Answered: <br />Answered by: ARM <br />