Laserfiche WebLink
Minn. Stat. § 16C.285, Subd. 4. VERIFICATION OF COMPLIANCE. <br />A contractor responding to a solicitation document of a contracting authority shall submit to the contracting authority a <br />signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in <br />subdivision 3, with the exception of clause (7), at the time that it responds to the solicitation document. <br />A contracting authority may accept a signed statement under oath as sufficient to demonstrate that a contractor is a <br />responsible contractor and shall not be held liable for awarding a contract in reasonable reliance on that statement. A <br />prime contractor, subcontractor, or motor carrier that fails to verify compliance with any one of the required minimum <br />criteria or makes a false statement under oath in a verification of compliance shall be ineligible to be awarded a <br />construction contract on the project for which the verification was submitted. <br />A false statement under oath verifying compliance with any of the minimum criteria may result in termination of a <br />construction contract that has already been awarded to a prime contractor or subcontractor or motor carrier that <br />submits a false statement. A contracting authority shall not be liable for declining to award a contract or terminating a <br />contract based on a reasonable determination that the contractor failed to verify compliance with the minimum criteria <br />or falsely stated that it meets the minimum criteria. A verification of compliance need not be notarized. An electronic <br />verification of compliance made and submitted as part of an electronic bid shall be an acceptable verification of <br />compliance under this section provided that it contains an electronic signature as defined in section 325L.02, <br />paragraph (h). <br />CERTIFICATION <br />By signing this document I certify that I am an owner or officer of the company, and I certify under oath that: <br />1) My company meets each of the Minimum Criteria to be a responsible contractor as defined herein and is in <br />compliance with Minn. Stat. § 16C.285, and <br />2) if my company is awarded a contract, I will submit Attachment A-1 prior to contract execution, and <br />3) if my company is awarded a contract, I will also submit Attachment A-2 as required. <br />Authorized Signature of Owner or Officer: Printed Name: <br />Title: Date: <br />Company Name: <br />NOTE: Minn. Stat. § 16C.285, Subd. 2, (c) If only one prime contractor responds to a solicitation document, <br />a contracting authority may award a construction contract to the responding prime contractor even if the <br />minimum criteria in subdivision 3 are not met. <br />Revised 2/3/2021 Page 3 of 5 <br />