Laserfiche WebLink
CONSIDER TRAFFIC CONTROL CHANGES ON <br />ALPINE DRIVE AT CSAR 83 AND CSAR 56 <br />By: Steven Jankowski, City Engineer <br />Background: <br />CASE 4 <br />Attached are figures illustrating the suggested signage'changes to the intersections of the Alpine <br />Drive/CSAR 83 and Alpine Drive/CSAR 56 recommended by Anoka Highway Department. The <br />primary changes associated with this new traffic control plan for these two intersections include <br />the following: <br />(a) Placing a double set of STOP signs on the City street approaches; with a standard 36 inch <br />sign on the left side and an oversized 48 inch sign on the right; and including Cross Traffic Does <br />Not Stop tags beneath the STOP signs. <br />(b) Installing a double set of symbol style STOP AHEAD signs on both sides of the City street <br />approaches. In the case of eastbound Alpine boulevard approaching Ramsey Boulevard this will <br />be a replacement of a word style STOP AHEAD sign. These STOP AHEAD signs will be <br />placed at the approach distances recommended in the Uniform Manual on Traffic Control <br />Devices in Minnesota. . <br />Anoka County indicated that the changes described in (a) above were to be made by the County • <br />Highway Department during the week of November 7, 2006. The changes recommended in <br />portion (b) above would be the responsibility of the City. <br />Recommendation: <br />Staff is recommending that the City proceed with the installation of the recommended signage <br />changes to the intersections of Alpine Boulevard and CSAH 83 and Alpine Boulevard and <br />CSAH 56 at an estimated cost of $1200. <br />Action: <br />Motion to recommend to City Council that staff be directed to proceed with the installation of the <br />recommended signage changes to the intersections of Alpine Boulevard and CSAR 83 and <br />Alpine Boulevard and CSAH 56 at an estimated cost of $1200 with the cost of the signage to be <br />from the Public Works sign account. <br />Reviewed by: <br />Public Works Director/Principal Engineer <br />Fire Chief <br />Police Chief <br />Finance Officer <br />Street Supervisor <br />PW: 11/21/06 <br />—180 <br />