Laserfiche WebLink
031 RFP 018 CU 3 Relocation $21,596.32 <br />Dewatering for ROW <br />032 Watermain $10,870.65 <br />Connection <br />033 Field Order Pipe Penetration $20,403.86 <br />No. 10 Additional Rebar <br />034 Specialty Urethane Painting $50,440.88 <br />Meeting Modifications <br />035A Submittal Dedication Plaque $1,374.52 <br />145 Modifications <br />Manhole Install and Manhole No. 1 -$19,917.35 <br />No. 1 Dewatering <br />036 RFI 056 EIFs Base Flashing $2,131.50 <br />:101E2s® <br />www.ae2s.com <br />Field <br />Directed <br />037 Filter Masonry Wall $10,596.47 <br />Cut <br />Water Wick <br />038 Connection to Lower $2,408.60 <br />039 <br />040 <br />041 <br />042 <br />043 <br />Field <br />Directed <br />Field <br />Directed <br />Field Order <br />No. 17 <br />Field <br />Directed <br />RFP 019 <br />Allowance <br />Field <br />Directed <br />Level <br />RWL Route <br />Modification <br />$3,437.04 <br />Transformer Bollards $4,324.89 <br />$6,921.19 <br />Plate Settler Flow <br />Meter Locations <br />Irrigation Allowance <br />Communications <br />Conduit Addition <br />044 RFI 066 Generator Panel Feed <br />045 <br />Submittal <br />178 <br />046 RFP 020 <br />Added Beam <br />Stiffeners <br />Explosion Proof EF <br />Room 109 <br />047 RFI 073 Air Flow Meter <br />048 <br />049 <br />050 <br />RFP 022 <br />RFP 021 <br />Field Remote Actuator <br />Directed Hand Stations <br />Valve Actuator <br />Voltage <br />Sludge Line <br />Additional Drop Pipe <br />ALLOWANCE <br />TBD <br />$3,036.94 <br />$5,418.03 <br />$16,880.50 <br />$7,717.05 <br />$25,200.00 <br />$33,887.52 <br />$9,266.22 <br />Note: Any extension delays will be approved as a separate Change Order and <br />Contingency Expense. <br />N <br />Y <br />N <br />N <br />N <br />Y <br />Y <br />Y <br />Y <br />Y <br />Y <br />Y <br />N <br />N <br />Y <br />Approved — <br />Construction Contingency Expense 8 <br />Approved — <br />Construction Contingency Expense 9 <br />Engineer Rejected <br />(incidental to project) <br />Approved — <br />Constructing Contingency Expense 10 <br />Approved — <br />Constructing Contingency Expense 10 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 9 <br />Approved — <br />Constructing Contingency Expense 10 <br />Engineer Review <br />Engineer Rejected <br />Approved — <br />Constructing Contingency Expense 10 <br />Y Engineer Review <br />N Engineer Review <br />Pending — <br />Constructing Contingency Expense 11 <br />Pending — <br />Constructing Contingency Expense 11 <br />Pending — <br />Constructing Contingency Expense 11 <br />Pending — <br />Constructing Contingency Expense 11 <br />will not be included in this Construction <br />Y <br />N <br />Y <br />Y <br />Proposal No. 047 — Air Flow Meter: <br />A discrepancy in the plans resulted in the electrician not accounting for power being run to a flow meter on <br />the air wash blower distribution pipe. This meter is required to communicate with the modulating blower <br />supply valve to control air flow to the filters. To ensure proper filter operation and full SCADA integration, <br />additional electrical work is needed to provide power and communication to the meter. <br />This proposal includes the labor and materials to install the required conduit and wiring. The addition is <br />essential for the intended automated air wash operation, and if identified earlier, a comparable cost would <br />have been incorporated into the original contract. <br />Advanced Engineering and Environmental Services, Inc. <br />6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />