My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/14/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 10/14/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 4:22:40 PM
Creation date
10/16/2025 9:03:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/14/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111AGNEYC0N5TRUCT10N <br />„IYIMERCh, D INDUSTRIAL L(JNTRACTORS <br />gdri1401 Park Road Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />AE2S <br />Attention <br />Abby Bowman <br />E-mail Phone <br />Abigail.Bowman@AE2S.com (763) 463-5036 <br />Urgent <br />Total pages, including cover: <br />Please comment <br />2 <br />Proposal <br />From <br />Noah Pundsack <br />Date <br />9/10/2025 Revised 09/26/2025 <br />Magney Proposal No. 047A Revised <br />Air Flow Meter RFI - 073 <br />X❑ Please review For your information <br />COMMENTS <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Abby, <br />Magney Construction, Inc. is please to present the following quotation to furnish the necessary labor, <br />material, and equipment required per RFI - 073 to provide the electrical conduit and wiring for the Air Flow <br />Meter not shown in the electrical drawings. See the costs associated with change summarized below. <br />Labor: <br />Equipment: <br />Equipment: Misc. Small Tools And Equipment (10% of Labor) <br />Subcontractor: Erickson Electric Added Electrical For Air Flow Meter <br />Subtotal <br />General Contractor's Overhead <br />Bond & Insurance premiums <br />Lump Sum Total: <br />'Additional Calendar Days Required for this Change (Including material lead time): <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, <br />Noah Pundsack <br />Project Engineer Accepted By Date <br />7,240.96 <br />7,240.96 <br />362.05 <br />114.05 <br />7,717.05 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.