Laserfiche WebLink
111AGNEYC0N5TRUCT10N <br />„IYIMERCh, D INDUSTRIAL L(JNTRACTORS <br />gdri1401 Park Road Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />SEND TO <br />Company name <br />AE2S <br />Attention <br />Abby Bowman <br />E-mail Phone <br />Abigail.Bowman@AE2S.com (763) 463-5036 <br />Urgent <br />Total pages, including cover: <br />Please comment <br />5 <br />COMMENTS <br />Proposal <br />From <br />Noah Pundsack <br />Date <br />9/18/2025 Revised <br />Magney Proposal No. 049 R <br />RFP No. 022 - Valve Actuator Voltage <br />l Please review For your information <br />Re: Ramsey Water Treatment Plant - Ramsey, MN <br />Abby, <br />Magney Construction, Inc. is pleased to present the following quotation to furnish the necessary labor, <br />material, and equipment to complete the request for proposal No. 022 - Providing transformers and panels to <br />step down the power from the control panels at 480V to 120V. This is to allow designed controls to work with <br />the specified and approved valve actuators throughout the plant. See the costs associated with this change <br />summarized below. <br />Labor: <br />Material: <br />Equipment: <br />Subcontractor: Erickson Electric Provide 120v Power For The Actuators <br />Subtotal <br />General Contractor's Overhead <br />Bond & Insurance premiums <br />Lump Sum Total: <br />'Additional Calendar Days Required for this Change (Including material lead time): I 26.0 <br />31,796.88 <br />31,796.88 <br />1,589.84 <br />500.80 <br />33,887.52 <br />Please review this proposal and feel free to contact me with any questions, comments or concerns. <br />Thank you, p <br />oae4errJaaiar <br />Noah Pundsack <br />Project Engineer Accepted By Date <br />Page 1 of 1 <br />