Laserfiche WebLink
Erickson Electric <br />Material Cost <br />Material $ 9,516.58 <br />Tax 7.625% $ 725.64 <br />Material MU 10% $ 951.66 <br />Permit $ - <br />Labor Rate/hr Hours <br />PM/Estimator $190 1 $ 190.00 <br />Wireman $180 103 $ 18,540.00 <br />Overtime 1-1/2 $270 0 $ - <br />Overtime double time $360 0 $ - <br />Labor MU 10% $ 1,873.00 <br />Subcontractor <br />Mat. $ - <br />labor $ - <br />Markup @ 5% $ - <br />Subtotal $ 31,796.88 <br />Bond $ - <br />Total cost for this chanog $ 31,796.88 <br />