My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/14/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 10/14/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 4:22:40 PM
Creation date
10/16/2025 9:03:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/14/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAGNEY[ONSTRUCTION <br />-�-'-9CIAL 6 INDUSTRIAL CONTRACTORS <br />41401 Park Road - Chanhassen, MN 55317 <br />www.magneyconstruction.com 952.474.1674 Office 952.474.1679 Fax <br />Request for Information No. 073 <br />Ramsey Water Treatment Plant <br />City of Ramsey, MN <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />General Contractor: <br />Magney Construction, Inc. <br />1401 Park Road <br />Chanhassen, MN 55317 <br />Engineer: <br />AE2S <br />6901 E Fish Lake Road <br />Maple Grove, MN 55369 <br />Date Created: 08/08/2025. <br />Author: Noah Pundsack <br />Reference: Air Flow Meter <br />Drawing Number: P124 & P313 <br />Question: <br />Company: Magney Construction, Inc. <br />Specification: 26 90 01 — 2.5 <br />Date Required: 08/08/2025 <br />Shown on pages P124, P313 Note 97 calls out and Air Flow Meter. <br />Air Flow Meter Spec Section 26 90 01 — 2.5 <br />No electrical information is given and does not show up on the electrical drawings. <br />Needed information <br />Power info <br />Where to pull wires from <br />Where it's sending its information to <br />What it will be controlling <br />Please advise. <br />Date Answered: 8/19/2025 <br />Answer: Answered by: Aaron Mueller <br />Connect to blower valve power circuit to power the flow meter. <br />Provide a 4-20mA circuit (0.75"C-2/C#16SHLD) to SCADA PLC. Can <br />be either the main control panel or a sub -panel with PLC in the pump <br />gallery, whichever the Contractor can get to more easily. <br />Ensure adequate run length measurements for flow meter install <br />location per manufacturers requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.