My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/28/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 4:50:23 PM
Creation date
10/28/2025 1:49:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/28/2025
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Init. <br />§ 1.1.4 The Owner's anticipated design and construction milestone dates: <br />.1 Design phase milestone dates, if any: <br />.2 Construction commencement date: <br />.3 Substantial Completion date or dates: <br />June 30, 2026 <br />.4 Other milestone dates: <br />§ 1.1.5 The Owner's requirements for accelerated or fast -track scheduling, or phased construction, are set forth below: <br />(Identify any requirements for fast -track scheduling or phased construction.) <br />The project must be complete and open to the public by June 30, 2026 <br />§ 1.1.6 The Owner's anticipated Sustainable Objective for the Project: <br />(Identify and describe the Owner's Sustainable Objective for the Project, if any) <br />§ 1.1.6.1 If the Owner identifies a Sustainable Objective, the Owner and Construction Manager shall complete and <br />incorporate AIA Document E234Tm-2019, Sustainable Projects Exhibit, Construction Manager as Constructor Edition, <br />into this Agreement to define the terms, conditions and services related to the Owner's Sustainable Objective. If <br />E234-2019 is incorporated into this agreement, the Owner and Construction Manager shall incorporate the completed <br />E234-2019 into the agreements with the consultants and contractors performing services or Work in any way associated <br />with the Sustainable Objective. <br />§ 1.1.7 Other Project information: <br />(Identify special characteristics or needs of the Project not provided elsewhere.) <br />§ 1.1.8 The Owner identifies the following representative in accordance with Section 4.2: <br />(List name, address, and other contact information.) <br />Mark Riverblood <br />Parks and Assistant Public Works Director <br />14199 Jasper Street <br />Ramsey, MN 55303 <br />mriverblood@ci.ramsey.mn.us <br />763-238-1733 <br />§ 1.1.9 The persons or entities, in addition to the Owner's representative, who are required to review the Construction <br />Manager's submittals to the Owner are as follows: <br />AIA Document A133 — 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects," <br />"AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:24:29 ET on <br />10/16/2025 under Order No.4104243742 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with <br />the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (846025776) <br />
The URL can be used to link to this page
Your browser does not support the video tag.