|
Init.
<br />§ 1.1.13 The Owner's requirements for the Construction Manager's staffing plan for Preconstruction Services, as required
<br />under Section 3.1.9:
<br />(List any Owner -specific requirements to be included in the staffing plan)
<br />§ 1.1.14 The Owner's requirements for subcontractor procurement for the performance of the Work:
<br />(List any Owner -specific requirements for subcontractor procurement.)
<br />§ 1.1.15 Other Initial Information on which this Agreement is based:
<br />§ 1.2 The Owner and Construction Manager may rely on the Initial Information. Both parties, however, recognize that
<br />such information may materially change and, in that event, the Owner and the Construction Manager shall appropriately
<br />adjust the Project schedule, the Construction Manager's services, and the Construction Manager's compensation. The
<br />Owner shall adjust the Owner's budget for the Guaranteed Maximum Price and the Owner's anticipated design and
<br />construction milestones, as necessary, to accommodate material changes in the Initial Information.
<br />§ 1.3 Neither the Owner's nor the Construction Manager's representative shall be changed without ten days' prior notice
<br />to the other party.
<br />ARTICLE 2 GENERAL PROVISIONS
<br />§ 2.1 The Contract Documents
<br />The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other
<br />Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in
<br />this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract and are as
<br />fully a part of the Contract as if attached to this Agreement or repeated herein. Upon the Owner's acceptance of the
<br />Construction Manager's Guaranteed Maximum Price proposal, the Contract Documents will also include the documents
<br />described in Section 3.2.3 and identified in the Guaranteed Maximum Price Amendment and revisions prepared by the
<br />Architect and furnished by the Owner as described in Section 3.2.8. The Contract represents the entire and integrated
<br />agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or
<br />oral. If anything in the other Contract Documents, other than a Modification, is inconsistent with this Agreement, this
<br />Agreement shall govern. An enumeration of the Contract Documents, other than a Modification, appears in Article 15.
<br />§ 2.2 Relationship of the Parties
<br />The Construction Manager accepts the relationship of trust and confidence established by this Agreement and covenants
<br />with the Owner to cooperate with the Architect and exercise the Construction Manager's skill and judgment in furthering
<br />the interests of the Owner to furnish efficient construction administration, management services, and supervision; to
<br />furnish at all times an adequate supply of workers and materials; and to perform the Work in an expeditious and
<br />economical manner consistent with the Owner's interests. The Owner agrees to furnish or approve, in a timely manner,
<br />information required by the Construction Manager and to make payments to the Construction Manager in accordance with
<br />the requirements of the Contract Documents.
<br />§ 2.3 General Conditions
<br />§ 2.3.1 For the Preconstruction Phase, AIA Document A201Tm-2017, General Conditions of the Contract for
<br />Construction, shall apply as follows: Section 1.5, Ownership and Use of Documents; Section 1.7, Digital Data Use and
<br />Transmission; Section 1.8, Building Information Model Use and Reliance; Section 2.2.4, Confidential Information;
<br />Section 3.12.10, Professional Services; Section 10.3, Hazardous Materials; Section 13.1, Governing Law. The term
<br />"Contractor" as used in A201-2017 shall mean the Construction Manager.
<br />§ 2.3.2 For the Construction Phase, the general conditions of the contract shall be as set forth in A201-2017, which
<br />document is incorporated herein by reference. The term "Contractor" as used in A201-2017 shall mean the Construction
<br />Manager.
<br />AIA Document A133 — 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects,"
<br />"AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:24:29 ET on
<br />10/16/2025 under Order No.4104243742 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with
<br />the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
<br />User Notes: (846025776)
<br />
|