<br />§ 7.2.2 Wages or salaries of the Construction Manager's supervisory and administrative personnel when stationed at the
<br />site and performing Work, with the Owner's prior approval.
<br />§ 7.2.2.1 Wages or salaries of the Construction Manager's supervisory and administrative personnel when performing
<br />Work and stationed at a location other than the site, but only for that portion of time required for the Work, and limited to
<br />the personnel and activities listed below:
<br />(Identify the personnel, type of activity and, if applicable, any agreed upon percentage of time to be devoted to the Work.)
<br />See attached Fee Summary Sheet.
<br />§ 7.2.3 Wages and salaries of the Construction Manager's supervisory or administrative personnel engaged at factories,
<br />workshops or while traveling, in expediting the production or transportation of materials or equipment required for the
<br />Work, but only for that portion of their time required for the Work.
<br />§ 7.2.4 Costs paid or incurred by the Construction Manager, as required by law or collective bargaining agreements, for
<br />taxes, insurance, contributions, assessments and benefits and, for personnel not covered by collective bargaining
<br />agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations and pensions,
<br />provided such costs are based on wages and salaries included in the Cost of the Work under Sections 7.2.1 through 7.2.3.
<br />§ 7.2.5 If agreed rates for labor costs, in lieu of actual costs, are provided in this Agreement, the rates shall remain
<br />unchanged throughout the duration of this Agreement, unless the parties execute a Modification.
<br />§ 7.3 Subcontract Costs
<br />Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts
<br />and this Agreement.
<br />§ 7.4 Costs of Materials and Equipment Incorporated in the Completed Construction
<br />§ 7.4.1 Costs, including transportation and storage at the site, of materials and equipment incorporated, or to be
<br />incorporated, in the completed construction.
<br />§ 7.4.2 Costs of materials described in the preceding Section 7.4.1 in excess of those actually installed to allow for
<br />reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner's property at the completion of
<br />the Work or, at the Owner's option, shall be sold by the Construction Manager. Any amounts realized from such sales
<br />shall be credited to the Owner as a deduction from the Cost of the Work.
<br />§ 7.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items
<br />§ 7.5.1 Costs of transportation, storage, installation, dismantling, maintenance, and removal of materials, supplies,
<br />temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are
<br />provided by the Construction Manager at the site and fully consumed in the performance of the Work. Costs of materials,
<br />supplies, temporary facilities, machinery, equipment, and tools, that are not fully consumed, shall be based on the cost or
<br />value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the
<br />Project site. Costs for items not fully consumed by the Construction Manager shall mean fair market value.
<br />§ 7.5.2 Rental charges for temporary facilities, machinery, equipment, and hand tools not customarily owned by
<br />construction workers that are provided by the Construction Manager at the site, and the costs of transportation,
<br />installation, dismantling, minor repairs, and removal of such temporary facilities, machinery, equipment, and hand tools.
<br />Rates and quantities of equipment owned by the Construction Manager, or a related party as defined in Section 7.8, shall
<br />be subject to the Owner's prior approval. The total rental cost of any such equipment may not exceed the purchase price of
<br />any comparable item.
<br />§ 7.5.3 Costs of removal of debris from the site of the Work and its proper and legal disposal.
<br />§ 7.5.4 Costs of the Construction Manager's site office, including general office equipment and supplies.
<br />§ 7.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, subject to the
<br />Owner's prior approval.
<br />AIA Document A133 — 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Architects,"
<br />"AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:24:29 ET on 13
<br />10/16/2025 under Order No.4104243742 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with
<br />the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
<br />User Notes: (846025776)
<br />
|