My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/28/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 4:50:23 PM
Creation date
10/28/2025 1:49:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/28/2025
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Init. <br />§ A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are <br />to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial <br />Completion of such portions by the following dates: <br />Portion of Work Substantial Completion Date <br />§ A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated <br />damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. <br />ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED <br />§ A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract <br />Documents and the following: <br />§ A.3.1.1 The following Supplementary and other Conditions of the Contract: <br />Document Title Date Pages <br />§ A.3.1.2 The following Specifications: <br />(Either list the Specifications here, or refer to an exhibit attached to this Amendment.) <br />Section Title Date Pages <br />§ A.3.1.3 The following Drawings: <br />(Either list the Drawings here, or refer to an exhibit attached to this Amendment.) <br />Number <br />Title Date <br />§ A.3.1.4 The Sustainability Plan, if any: <br />(If the Owner identified a Sustainable Objective in the Owner 's Criteria, identify the document or documents that <br />comprise the Sustainability Plan by title, date and number of pages, and include other identifying information. The <br />Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; <br />implementation strategies selected to achieve the Sustainable Measures; the Owner's and Construction Manager's roles <br />and responsibilities associated with achieving the Sustainable Measures; the specific details about design reviews, testing <br />or metrics to verb achievement of each Sustainable Measure; and the Sustainability Documentation required for the <br />Project, as those terms are defined in Exhibit C to the Agreement.) <br />Title <br />Other identifying information: <br />Date Pages <br />§ A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price: <br />(Identify each allowance.) <br />Item Price <br />§ A.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based: <br />(Identify each assumption and clarification) <br />AIA Document A133 — 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of <br />Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:26:38 <br />ET on 10/16/2025 under Order No.4104243742 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in <br />accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (1668433972) <br />
The URL can be used to link to this page
Your browser does not support the video tag.