Laserfiche WebLink
FEES AND CHARGES <br />0 0 ;Q o 0 0 0 <br />• y u 0 0 0 <br />.riV O O <br />• o . n a v <br />'O C) ,- o P <br />N E <br />2.O <br />0 . <br />y,i o <br />a o <br />Per Ace Contract <br />Per 2016 Comprehensive Sower Study <br />dential/Single dwelling usage fee/qtr <br />e e e e <br />b O P PO P <br />O OOO <br />ion cost index <br />based on nationalllocal constru <br />EEE000 <br />C O O <br />0 O 0 <br />0 0 0 <br />c0ouc <br />0 0 <br />C 0 0 <br />0 o 0 <br />0 O 0 <br />.R .� .0 <br />0 0 O <br />000 <br />c o c <br />000 <br />a a a <br />s <br />30 <br />r (a $98.00/year <br />0 o E <br />P C O O C 0 0 • 0 • 0 • op O j y' p <br />o 5 00 ti E N O O o C a J <br />h <br />N W N b .0 N q b 01 OP1 ry= c <br />N C 0. o _ <br />o o o 0.0 0 u <br />2020 O 0 Y <br />70 <br />vi s. s. o o '.o. R <br />▪ 'O 40. '0 a 0 it <br />O 0 <br />0 <br />o a 4 x <br />M <br />x <br />a 69 at <br />CrN <br />4 <br />Per 2012 & 2017 Comprehensive Water System Study <br />Conservation Rates <br />$= <br />$3.93 <br />$' <br />a s <br />o o <br />oo <br />66 <br />0 <br />a <br />0 <br />change based on price increases: Will always be cost plus 5% <br />Cost plus 500 <br />to change based on price increases: Will always be cost plus 5% <br />a <br />1" T10 Meter - Radio Read System <br />c <br />0 <br />change based on price increases: Will always be cost plus 5% <br />1 1/2" T10 Meter - Radio Read System <br />Cost plus 5% <br />be cost plus 5% <br />Subject to change based on price increases: Mill <br />1 1/2" Mach 10 - Radio Read System <br />