My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/28/2025
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2025
>
Agenda - Council Work Session - 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 3:35:52 PM
Creation date
10/28/2025 2:19:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/28/2025
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.SCHEDUL� <br />• ... <br />a- Material Seledlolls. Some materials included in the design may need to be modified to accommodate <br />the construction schedule. Our team expects to be engaged in the design process to identify these <br />materials in real-time and to find timely alternatives as needed. We've already identified several <br />materials that we'd like to revise, either to maintain the schedule or improve the finished piuduc.l, as <br />follows: <br />1. Plans show a precast bridge on sheet L120 (noted as AM-03). Precast bridges carry long lead times <br />and their piuLisa dimensions are often field verified before fabrication begins, which our schedule <br />cannot accommodate. We recommend revising the bridge to be timber or a prefabricated <br />assembly to ensure materials can be delivered on schedule. <br />2. Plans call for Turf Grass across the site, which we would rcuit'mend confirming is intended to be <br />sod and not seed. This will help expedite the turf establishment after the project is completed and <br />reduce the likelihood that park patrons and pedestrian traffic will damage the turf before can be <br />established. <br />a Plan sheet L110 shows fairly extensive pavers (noted as P-05) surrounding decorative concrete. <br />Pavers can be expensive and are very time consuming to install when compared to decorative <br />concrete. We would recommend changing these pavers to decorative concrete to expedite the <br />schedule and reduce the construction cost. <br />4. Decorative concrete types P-01 through P-04 call for fiber reinforcement, which we would <br />recommend changing to wire mesh reinforcement. While it is faster to install fiber reinforcement, <br />the fibers can protrude from the concrete and are not appealing to walk on with bare feet. <br />Considering the combined play and water elements included in this project, fiber reinforcement <br />may not be the best product to use here. <br />7/hGIIMAPoUS1Si Pk&W / CIKS MINIM <br />/ 0000000 <br />TWIN CITIES <br />LARGEST GENERAL <br />CONTRACTORS <br />H.UConstnction <br />MUM <br />2025 <br />WHY H+U? <br />What makes H+U Construction different from our competition? It's our people, their <br />commitment to a job well done, their dedication to our clients, and the determination <br />to be the best they can be through continuous learning and refinement of their skills <br />in Construction Management. <br />Our teamwork philosophy spreads far beyond our office walls and runs deep between <br />our collaborative work with all our partners, clients, architects, engineers, contractors, <br />communities and owners we work with - resulting in strong, long-lasting relationships. <br />V H+U CONSTRUCTION <br />www.hu-construction.com PAGE 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.