My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/28/2025
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2025
>
Agenda - Council Work Session - 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 3:35:52 PM
Creation date
10/28/2025 2:19:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/28/2025
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. SITE LOGISTICS + DISRUPTION AVOIDANCE <br />All Visitors Must Report to Rai MOW* <br />Minimum Personal Psn '•E9 000l4PE. no.rr i.: <br />mind Hot -.". <br />SAM 0 <br />ilig <br />...� <br />H+U projects <br />have had <br />zero willful <br />citations or <br />lost time <br />injuries in over <br />5-years. <br />• Describe your disruption voidance plan for all stages of the projec <br />Disruption Avoidance Plans (DAP) are a large part of nearly every project <br />H+U takes on, and it is always our goal to be a "good neighbor". We do <br />not expect that the project will disrupt utility service to the neighboring <br />properties or require street closures, but there are still disruptions that <br />we need to minimize and communicate, including: <br />+ Night and/or Weekend Work: Given the expedited schedule, <br />it is likely that crews will need to work extended days and/or on <br />weekends to expedite the project. Our team was unable to find <br />city ordinances restricting work hours, but if there are ordinances <br />that restrict work, we would like to discuss a temporary variance <br />allowing crews to work up to 12-hour days M-F, and between the <br />hours of 8:00 and 4:00 on occasional weekends. In the event that <br />a variance is granted, H+U will prepare signage and marketing <br />materials to be posted at the site and delivered to neighboring <br />buildings explaining the specific days, hours, and activities that will <br />be taking place on site. <br />+ Construction Noise: Deliveries and heavy equipment operating <br />hours will be restricted to Monday through Friday between the <br />hours of 8:00 am and 4:00 pm in order to limit the noise generated <br />by the project and to be a good neighbor. Our Superintendent <br />will enforce these hours, which will also be discussed at every <br />construction meeting and documented in meeting minutes. <br />+ Dust Protection: Any soils that are exposed to the elements for <br />short periods will be misted with water to minimize dust. Soils left <br />exposed for longer periods will be seeded. <br />+ Parking Lot Closure: Our current site plan shows the small parking <br />lot east of the site being restricted for subcontractor parking, which <br />would also serve as a site access point for large equipment such as <br />truck cranes, cement trucks, tree spade trucks, boulder deliveries, <br />etc. This closure will be advertised with signage in advance, and <br />directional signage will also be provided directing drivers to other <br />on -street parking areas near the park. <br />+ Short-term Sidewalk Closures: We intend to maintain pedestrian access to the sidewalk along Center <br />Street during construction, but there will be times when it will be obstructed to allow materials and <br />equipment to access the site by crossing the sidewalk. Our staff will post signage along the sidewalk <br />notifying pedestrians of dates when the sidewalk may be obstructed for several minutes at a time <br />throughout the day, and if necessary, can provide staff to direct vehicles and pedestrians at times. <br />+ Stormwater Pollution Protection: A stormwater pollution protection plan (SWPPP) and SWPPP Permit <br />will be required for the project, and is especially important considering the sites proximity to the <br />neighboring pond. H+U will provide SWPPP monitoring and enforcement including site inspections <br />after rain events and throughout work days, street and sidewalk sweeping, additional silt fence or silt <br />fence repairs, inlet protection, tire wash(s), etc. to ensure compliance with the permit and to help the <br />site appears neat and tidy at all times. <br />+ On -Site Supervision: H+U will provide full-time supervision for the project, with staff on -site at all times <br />when work is being completed. This ensures thatthere will always be a representative on site to enforce <br />our standards, address concerns, and coordinate deliveries, manage the site, and represent the City's <br />interests in real-time. <br />V H+U CONSTRUCTION <br />www.hu-construction.com PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.