City of Ramsey— Waterfront Park <br />Early Bid — Grading <br />Scope of work: <br />1. Provide all SWPPP items — silt fence, bio logs, rock entrance, etc. <br />2. Provide $10,000 allowance for SWPPP maintenance until April 15, 2026. <br />a. H+U Construction will pull MPCA Construction Stormwater Permit and <br />awarded contractor will be responsible for maintaining BMPs if/as required. <br />H+U will perform inspections and notify awarded contractor of needed <br />repairs. Allowance won't be used for repairs to damaged BMPs caused by <br />awarded contractor. <br />3. Provide street sweeping as required during work activities and at completion of <br />work. <br />4. Protect existing utilities and site amenities. <br />5. Provide dust control as required. <br />6. Provide hydroseed stabilization of all disturbed areas at completion of work. <br />7. Provide mass grading to subgrade elevations (within .1 inch) <br />a. Leave 12" below finished grade in concrete splashpad, concrete walk, and <br />shelter footprint areas <br />b. Leave 6" below finished grade in synthetic turf area <br />c. See sheet L140 for other hold-downs in planting areas <br />8. Spread and finish grade existing topsoil in SP-01 areas around the splashpad but not <br />in the sloped area near the pond — don't disturb this area other than installing BMPs. <br />Import additional topsoil as needed to meet plan requirements. Owner will test <br />existing topsoil prior to placement. Awarded contractor needs to provide testing <br />and results of any imported topsoil prior to placement in SP-01 areas. <br />9. Stockpile any excess existing topsoil on site for placement in 2026. <br />10. Import gravel base and stockpile on site for placement in 2026. <br />a. 6" gravel base beneath all concrete areas (splashpad, walks, shelter <br />footprints), curbs, rocks. <br />11. Provide requirements of spec 310000 and 311000 as applicable to the work of this <br />contract. <br />12. Provide silt fence around stockpiled material. <br />13. H+U Construction will provide 3 survey benchmarks on the site. Awarded <br />contractor is responsible for their own layout/surveying to complete the work. <br />14. Provide utility locates for your work. <br />15. Provide traffic control as required for your work. <br />