My WebLink
|
Help
|
About
|
Sign Out
Home
Ordinance - #06-32 - 11/28/2006
Ramsey
>
Public
>
Ordinances
>
2006
>
Ordinance - #06-32 - 11/28/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 10:58:08 AM
Creation date
12/14/2006 10:56:26 AM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Ordinances
Resolution or Ordinance Number
#06-32
Document Date
11/28/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A. Stabilizing all exposed soils and soil stockpiles and the related time frame or <br />schedule. <br /> <br />B. Establishing permanent vegetation and the related time frame or schedule. <br /> <br />C. Preventing sediment damage to adjacent properties and other designated <br />areas such as streams, wetlands, lakes and unique vegetation (e.g., oak <br />groves, rare and endangered species habitats.) <br /> <br />D. Scheduling for erosion and sediment control practices. <br /> <br />E. Where permanent and temporary sedimentation basins will be located. <br /> <br />F. Engineering the construction and stabilization of steep slopes. <br /> <br />G. Measures for controlling the quality and quantity of storm water leaving a <br />site. <br /> <br />H. Stabilizing all waterways and outlets. <br /> <br />1. Protecting storm sewers from the entrance of sediment. <br /> <br />J. What precautions will be taken to contain sediment when working in or <br />crossing water bodies. <br /> <br />K. Restabilizing utility construction areas as soon as possible. <br /> <br />L. Protecting paved roads from sediment and mud brought in from access <br />routes. <br /> <br />M. Disposing of temporary erosion and sediment control measures. <br /> <br />N. How the temporary and permanent erosion and sediment control practices <br />will be maintained. <br /> <br />O. How collected sediment and floating debris will be disposed of. <br /> <br />9.27.10 Minimum Storm Water Pollution Control Measures and Related Inspections. <br />These minimum control measures are required where bare soil is exposed. Due to the diversity of <br />individual construction sites, each site will be individually evaluated. Where additional control <br />measures are needed, they will be specified at the discretion of the city engineer. The city will <br />determine what action is necessary to prevent excessive erosion from occurring on the site. <br /> <br />Page 9 of21 <br />November 8, 2006 <br /> <br />Storm Water Pollution Control Ordinance <br />
The URL can be used to link to this page
Your browser does not support the video tag.