Laserfiche WebLink
4 O 0 O O <br />I-0 O I-0 0 <br />2026 thru 2035 <br />E. <br />4-' <br />a) <br />E <br />a) <br />0 <br />�z <br />E 2 <br />RI CD <br />113 <br />i�f E <br />t.) CC <br />26-STR-017 <br />COR Streetscape Improvements <br />Project Name <br />Street Improvements <br />0 <br />0 <br />0 <br />Total Project Cost <br />Street Improvement <br />Improvement <br />rcs <br />V1 <br />2-New Addition (High) <br />0 <br />w .o <br />47. <br />•J Q- <br />i <br />v <br />T O vvi N <br />This project location is along and within street right-of-ways of the 2024 COR Infrastucture Improvements in the NW quadrant of the COR. <br />0 <br />0 <br />rts <br />The scope of work for this project consists of installing irrigation and approximately 75 boulevard trees for Ramsey Parkway, Center Street, and the east side of Zeolite Street, north of Ramsey Parkway. <br />U1 O 0 lfl O 0 <br />M M <br />0 0 <br />N N <br />Cr O 0 O 0 <br />M M <br />0 0 <br />M O 0 M O 0 <br />M M <br />0 0 <br />N O 0 N O 0 <br />M M <br />0 0 <br />P 0 0 P 0 0 <br />M M <br />0 0 <br />0 0 O O O O <br />O 0 <br />N N <br />01 O 0 p1 O 0 <br />N N <br />0 0 <br />N N <br />N0 0 CO O 0 <br />0 0 <br />n O 0 N O 0 <br />N N <br />0 0 <br />N N <br />'O O 0 10 O 0 <br />O O 0 O o 0 <br />N o 00 N 0 Oc <br />Expenditures <br />Improvements Other than Building Cost <br />R R <br />0 0 <br />H H <br />Funding Sources <br />Public Improvement Revolving Fund <br />Produced Using Plan -It CIP Software <br />